![Jinko Solar JKS-3-6HLVS-ABI Series Скачать руководство пользователя страница 11](http://html.mh-extra.com/html/jinko-solar/jks-3-6hlvs-abi-series/jks-3-6hlvs-abi-series_user-manual_2018525011.webp)
H.Installation position shall not prevent access to the disconnection means.
I.In order to ensure machine can run normally and easy to operate, please pay
attention to provide adequate space for JKS, please refer to below:
Chart 5.3
J.Do not install the machine near television antenna or any other antennas and antenna
cables
K.Don't install the machine in the living area
L.Be sure that the machine is out of the children's reach
M.Taking the battery fixing space into account, about the dimensions please reference
user manual
N.The inflammable and explosive dangerous goods must not be placed around battery in
case of cause serious danger.
Note:
Testing to AS/NZS 4777.2:2020 has not been conducted for multiple phase
combinations.
Chart 5.4
5.2 Installation Requires Tools and RJ45 Terminal Sequence of The
LAN Line
When installing, we need to use tools as follow, prepare the follow tools before
installing
:
No.
Description
1
Press the RJ45 terminal
2
Press battery terminal connector
3
Disconnect PV terminal
4
Unscrew nut
5
Unscrew screw
6
Knock explosion bolt
7
Drill holes on the wall
LAN line RJ45 sequence as follow:
Chart 5.5
Chart 5.6
LAN line 1-8 colors as below:
PIN
1
2
3
4
5
6
7
8
Color
White
orange
Orange
White
green
Blue
White
blue
Green
White
brown
Brown
15
16