![JGR PT1 Скачать руководство пользователя страница 15](http://html.mh-extra.com/html/jgr/pt1/pt1_user-manual_647223015.webp)
PT1 User Manual
10
M-PT1-001-01
5
OPERATION
Powering Up the Meter
To power up the meter:
1.
Verify that the power switch is set to the “off” position (O). Connect the meter to an AC power
supply using the power cord provided.
2.
Toggle the power switch to the “on” position (I). The JGR logo will flash on the screen during the
unit’s initialization.
Device Information and Settings
Swipe left to access the
Setup
page (farthest page to the right, see Figure 4). This page will display
information about the unit and its connectivity status.
Figure 4: PT1
Setup
page
Selecting a Test Plan
Swipe right to access the
Test Plan Information
page (Figure 5).
Scan an XN1
test plan barcode while on this screen to load the plan onto the PT1. Please refer to the
XN1
Server User Manual
for more information.