JG special products GmbH
Seite | 22
Use a finger to gently pry both fluicid coupling covers off in order to inspect the ink
tube connections underneath.
Visually inspect each tubing connection point for leaks. If leaks are found, escalate
to a technician for troubleshooting.
Follow the exposed length of each tube and visually inspect each ink tube for kinks
or pinches in the tubing. Undo the irregularity to allow ink to flow freely. Escalate to
a technician if leaks result.
Re-install the fluidic coupling covers.
Re-install any housing removed to access this area.
Pinch valve and
vents (x5)
Pump motor
Buffer Box
Ink Tubing
Peristaltic (ink)
Pump