JG special products GmbH
Seite | 21
Ink tubing inspection
The following ink tubing and connections, visible to the operator, must be inspected every
month:
Fluidic coupling (aka Revolver Caps)
Buffer box
Pinch valve
Peristaltic (ink) pump
Refer to the following pictures to identify the specific hardwares.
Remove any housing or covers positioned around the ink tubing.
NOTE:
The clamshell should be closed during this procedure.
Tubing into fluidic
couplings
Peristaltic
pump
Pinch valve and
vents (x5)