
Jets™ Jade Floor Toilet
Tel. +47 70 03 91 00
www.jetsgroup.com
Product No. TO661PO
Rev 2017-08-29 14:46
5
General Installation Information
Note: To avoid leakage between the toilet valve and the toilet bowl, it is important that the pipe is correctly aligned. Connections are to be secured
with hose clamps.
Installation
General Disclaimer
Drawings provided in the following examples are for illustration purposes only. Product details may vary from your individual purchase.
Installation Instructions
Toilet installation requires the following procedures to be carried out. For more specific technical details, refer to the individual data sheet. For
further information on any of the instructions supplied, any questions regarding installation or the products, please contact your local supplier or
Jets™ Service Department.
1
For installations with a pre-installed
valve, go to step 3.
2
Install the toilet valve
⑧
and the
spring
③
as per the products
installation instructions found in
the products data sheet.
3
If using Installation Alternative 2, affix
the cap (A) from the Pipe Cover
⑥
to
the wall. (B) will be installed later.
4
Move the toilet close to the wall.
Connect the ball valve from the
toilet valve to the water main.
Note: Do not over tighten.
5
Connect the release button/mechanism to the toilet valve.
For connection information see the installation description provided in the
Release Button's technical data sheet.
6
Press the valve onto the pipe
connection securely.
Note: Refer to Toilet
Connections - Installation
Alternative 1 and Alternative 2.
7
Adjust the length and install the Pipe
Cover (B) between the toilet bowl
and the wall to cover the
connections.
8
If using Installation Alternative 2,
use a cutting knife to cut out the
pipe access hole (A) in the back
cover
④
.
9
Install the back cover to the rear of
the toilet bowl.
10
Use silicon or similar beneath the
toilet bowl (A) to secure the bowl
to the floor.
Make sure you do not block the
drain opening (B).