
Installation and operation of the Mynx
INSTALLATION & OPERATING INSTRUCTIONS
16
INSTALLATION AND
OPERATING INSTRUCTIONS: Mynx
Fit the 3 screws (Ø5mm x 30mm long)
through a half-moon section of the
escutcheon plate, and fit the spring-loaded
toggles on the end of the screws. The
spring-loaded side must now be pushed
through the ceiling by compressing the
legs and allowing it to expand again on
the other side of the ceiling board.
To tighten the screws, they can be turned
by hand while gently pulling down. This
will prevent the legs from rotating freely.
It can be
NOTE: Do not seal the small air gap between
the flue pipe and the escutcheon plate.
All metal surfaces exposed inside the home, can be wiped clean with a clean dry
cloth, and any marks should be touched in using Jetmaster touch-up paint.
All metal surfaces exposed on the outside of the building must be coated with a high
quality heat resistant enamel paint. Before applying the enamel paint, first ensure that
all scratches are touched in with the Jetmaster touch-up paint. This will lay the
foundation for a durable outer coating.