Locate the power plug provided in the spare parts box. Plug the cable
into the machine and the other into a GROUNDED circuit. Ensure that
the circuit will not be overloaded with the addition of Space Ballz.
Check the units power requirements by referencing the serial
number plate BEFORE proceeding. Turn the game power on.
DANGER
ALWAYS INSPECT AND REPLACE DAMAGED
ELECTRICAL CORDS. DO NOT ATTEMPT TO USE OR
FIX A DAMAGED CORD
After the game is powered ON. Check to make sure all of the
following work properly:
1)
ALL LED lights on both the main cabinet and the control center
work properly. Check to ensure the plasma dish works properly
2)
The PC starts properly and an image is displayed on the monitor.
(It may take up to two minutes for the PC to start)
3)
A ball is loaded into the claw mechanism - and the claw
mechanism begins moving
ENSURE THAT ALL POWER SUPPLIES ARE SET TO THE
PROPER VOLTAGE BEFORE POWER ON
Check Box When This Step is Complete
Step # 14-A
Getting ready to power ON
Check Box When This Step is Complete
Step # 14
Getting ready to power ON
Locate the two power supplies in the rear of the game. Ensure that
both voltage selectors are set to the line voltage of your facility.
WARNING
Step # 15
Inspecting unit after power ON
Check Box When This Step is Complete
INSTALLATION INSTRUCTIONS
Jennison Entertainment Technologies
Space Ballz Service Manual
Page 35