
Step # 11
Installing the second vertical ball riser
Located in the main cabinet for shipping is the second vertical ball
riser. Remove the assembly from the unit and remove its packaging.
Note that this piece may also be packaged in a box outside the game.
CAUTION
ENSURE THAT BOTH CABINETS ARE ON LEVEL
GROUND BEFORE PUSHING TOGETHER - IF THEY ARE
NOT - IT WILL BE IMPOSSIBLE TO PUSH THE TWO
TOGETHER
When the two units are pushed together and you are sure that all
wires are stored properly and not being crushed, locate the four
screws, washers, and lock washers from the spare parts bag and
insert them into the four holes on the control center. If the control
center is aligned properly and the floor is level. The screws will go
right in. If the floor is angled at all - the screws will not go in!
Check Box When This Step is Complete
Step # 10-A
Attaching the control center to the main cabinet
Slowly push the control center in towards the main cabinet. If both
units are perfectly level - they will slide together with no problem. If
your floor is angled at all - the two units may not fit together with
out moving both units until you find a level location. DO NOT FORCE
THE TWO TOGETHER! YOU WILL DAMAGE THE WIRES. BE SURE TO
LOOK UNDER THE CABINET AS SOMEONE IS PUSHING THE TWO
TOGETHER TO ENSURE THE WIRES ARE NOT GETTING CRUSHED.
WARNING
ENSURE THAT BOTH CABINETS ARE ON LEVEL
GROUND BEFORE PUSHING TOGETHER
Check Box When This Step is Complete
Step # 10-B
INSTALLATION INSTRUCTIONS
Securing bolts to the control center
Check Box When This Step is Complete
Jennison Entertainment Technologies
Space Ballz Service Manual
Page 31