
Section II: Operation
Page 51
5-376-000086
REV. 4 - 07/10
9. Lower the boom to allow the
tow sling head to raise out of it
holder on the back side of the
boom.
10. Carefully extend and lower the
wrecker boom to allow the tow
sling head to rotate outward and
down away from boom.
11. Lower the tow sling to the
ground.
Содержание MPL40
Страница 2: ...5 376 000086 REV 4 07 10 ...
Страница 8: ...5 376 000086 REV 4 07 10 Page iv THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 26: ...Section I Safety Page 18 5 376 000086 REV 4 07 10 THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 80: ...Section II Operation Page 72 5 376 000086 REV 4 07 10 THIS PAGE INTENTIONALLY LEFT BLANK ...