Section II: Operation
Page 50
5-376-000086
REV. 4 - 07/10
6. Connect the hold back bars to
the tow sling lugs using the pins
that you removed earlier.
7. Rotate the “CAM” handles on
the hold back bars 180° to the
close position. Raise or lower
the boom slightly until the cam
locks on the tow sling hold bars
snap into the closed position.
8. Extend the wrecker boom and
adjust the wire rope cable(s) to
lift the top of the tow sling and
tow sling straps. Extend the
boom to the yellow indicator
mark on the inner boom
section of the wrecker boom.
Содержание MPL40
Страница 2: ...5 376 000086 REV 4 07 10 ...
Страница 8: ...5 376 000086 REV 4 07 10 Page iv THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 26: ...Section I Safety Page 18 5 376 000086 REV 4 07 10 THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 80: ...Section II Operation Page 72 5 376 000086 REV 4 07 10 THIS PAGE INTENTIONALLY LEFT BLANK ...