
Section II: Operation
Page 49
5-376-000086
REV. 4 - 07/10
3. Remove the tow sling hold back
bar retaining pins allowing the hold
back bars to swing out of its
retaining brackets on the sides
of the boom.
4. Rotate the “CAM” handles on the
hold back bars 180° to the open
position.
5. Swing the hold back bars out
toward the lower tow sling lugs
on the back of the body. Allow
the hold back bars to extend as
necessary.
Содержание MPL40
Страница 2: ...5 376 000086 REV 4 07 10 ...
Страница 8: ...5 376 000086 REV 4 07 10 Page iv THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 26: ...Section I Safety Page 18 5 376 000086 REV 4 07 10 THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 80: ...Section II Operation Page 72 5 376 000086 REV 4 07 10 THIS PAGE INTENTIONALLY LEFT BLANK ...