Section II: Operation
Page 24
5-376-000086
REV. 4 - 07/10
17. Power retract the grid boom until
the towed vehicle is about 3 to 4
feet from the back of the truck.
Leave enough room to maneuver
around corners without corner
binding or causing contact
between the two (2) vehicles.
Be
sure that the boom is extended
at least 4" to ensure
unobstructed crossbar
pivoting.
18. Be sure to maintain sufficient
clearances with the bottom of the
towed vehicle.
19. Attach the safety chains and
towing lights.
Safety chains
should be crossed from one
side of the recovery vehicle to
the opposite side of the towed
vehicle.
Содержание MPL40
Страница 2: ...5 376 000086 REV 4 07 10 ...
Страница 8: ...5 376 000086 REV 4 07 10 Page iv THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 26: ...Section I Safety Page 18 5 376 000086 REV 4 07 10 THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 80: ...Section II Operation Page 72 5 376 000086 REV 4 07 10 THIS PAGE INTENTIONALLY LEFT BLANK ...