
27/152
ELECTRIC BILGE PUMPS
The first electric bilge pump is loated in the well in the middle of the mess room.
The second electric bilge pump is located in the plumbing panel behind the starboard
mess room backboard..
You can energize the electric bilge pump from the electrical panel.
On the electrical panel - three possible positions : OFF / Automatic / Mechanically operated.
In the automatic position each pump is set off automatically by a trip switch located in the sump
area or in the bottom of the hull.
EMERGENCY BILGE PUMP
The manual bilge pump is in the cockpit.
The control arm of the pump shall be kept accessible whatever the circumstances.
Capacity: 15 litre / minute
Capacity: 69 litre / minute
Operation:
The electric bilge pumps are connected to the 12V service circuit. To enable operation the
12V circuit must be activated by turning on the battery switches.
WARNING
- The bilge pump system is not designed to provide buoyancy to the boat in
case of damage.
- The bilge pump system is designed to drive out the water being either sea
spray or leaks but absolutely not the water coming through a hole in the hull,
this hole being the result of a damage.
- Do not let the pumps run while dry, this may cause them damage.
- The water in the bilge shall be kept at its minimum.
- Check the functioning of each bilge pump regularly.
SAFETY PRECAUTIONS
- Clean off debris which could block the pump intake points or strainers. If the watertight
partitions which seal off the fore and aft points are fitted with valves they must be closed
at all times and only opened to drain water into the main bilge.
2
S
A
F
E
T
Y
Содержание SUN ODYSSEY 50DS
Страница 1: ...SUN ODYSSEY 50DS OWNER S MANUAL C ROISIERE 134949 Index K...
Страница 2: ......
Страница 4: ......
Страница 8: ......
Страница 10: ......
Страница 11: ...7 152 SPECIFICATIONS AND WARRANTY TECHNICAL SPECIFICATIONS CERTIFICATION DESIGN CATEGORY YOUR BOAT 1...
Страница 16: ......
Страница 32: ...28 152 USE STEERS FRANK OF HELP...
Страница 34: ......
Страница 35: ...31 152 HULL MAINTENANCE OF THE HULL LIFTING 3...
Страница 38: ......
Страница 48: ......
Страница 49: ...45 152 STEERING SYSTEM STEERING GEAR 5...
Страница 53: ...49 152 RIGGING AND SAILS STANDING RIGGING RUNNING RIGGING WINCHES SETTING THE SAILS SAILS 6...
Страница 67: ...63 152 INTERIOR INTRODUCTION INTERIOR MAINTENANCE MAINTENANCE OF FABRICS 7...
Страница 68: ...64 152 INTRODUCTION Version 2 Aft cabins 1 forward cabin Version 1 AFT cabin 2 forward cabins...
Страница 72: ......
Страница 73: ...69 152 WATER AND SEWAGE WATER WATER TANKS WATER SYSTEM DISTRIBUTION WATER SYSTEM DRAINAGE SEWAGE 8...
Страница 85: ...81 152 ELECTRICAL EQUIPMENT GENERAL INFORMATION 12 V DC SYSTEM 110 220 V AC SYSTEM EQUIPMENT 9...
Страница 88: ......
Страница 104: ...100 152 Conditioned air outlets Control box...
Страница 108: ...104 152 Earthing plate Ref 4 Remote control Master switch Ref 5 Seawater inlet Ref 6...
Страница 113: ...109 152 INTERFACE Location Chart table 9 ELECTRICAL EQUIPMENT...
Страница 114: ......
Страница 115: ...111 152 ENGINE GENERAL INFORMATION ENGINE FITTING 360 DOCKING VERSION 10...
Страница 118: ...114 152 ENGINE FITTING...
Страница 119: ...115 152 DIAGRAM LOCATION 10 ENGINE...
Страница 121: ...117 152 MAIN COMPONENTS OF THE ENGINE 1 Sea water filter 2 Diesel filter 3 Ventilator 4 Expansion tank 10 ENGINE...
Страница 124: ...120 152 FUEL SUPPLY VALVE...
Страница 144: ......
Страница 145: ...141 152 LAUNCHING LAUNCHING RECOMMENDATIONS STEPPING THE MAST 11...
Страница 146: ...142 152 POSITION OF HOISTING CRADLE AND STRAPS Note Measurements are expressed in mm...
Страница 149: ...145 152 WINTER STORAGE LAYING UP PROTECTION AND MAINTENANCE 12...
Страница 152: ......
Страница 154: ......
Страница 155: ...151 152...
Страница 156: ...152 152...