79/114
USE OF MARINE HEADS EQUIPPED WITH A WASTE HOLDING TANK (WHT)
Open the water intake valve (ref. 1) (valve handle parallel to the pipe).
In the case of a direct discharge into the sea: Open the draining valve (ref. 2).
In case you store the waste waters in the tank: Make sure the draining valve is closed (ref. 2)
(valve handle perpendicular to the pipe).
To drain the bowl, set the control lever of the pump slantwise (FLUSH) then operate the pump.
To dry the bowl, set the lever vertical (DRY) then operate the pump.
In order to avoid clogging the heads:
- Use absorbent paper exclusively.
- Schedule a regular rinsing through of the system with fresh water.
To empty the tank:
- In an authorized area, open the draining valve (ref. 2).
- In a marina equipped with a system to suck the waste waters, put the sucking hose into
the tank through the deck filler (ref. 3). Start the pump of the sucking system. The filler caps
are opened and closed with an appropriate key. When the tank is empty, check the cap
seal for condition then close the filler.
WARNING
Ask for information about the laws in force in your country or your marina about discharging
your waste waters into the sea.
PRECAUTION
Close the valves after each use and above all when the boat is unattended.
PRECAUTION
Regularly check how full the tank is. High pressure due to too high a level may cause leaks
or more unpleasant troubles.
7
PLUMBING
Содержание SUN ODYSSEY 39DS
Страница 1: ...SUN ODYSSEY 39DS OWNER S MANUAL C ROISIERE 902138 Index K...
Страница 2: ......
Страница 8: ......
Страница 9: ...5 114 SPECIFICATIONS AND WARRANTY SPECIFICATIONS YOUR BOAT 1...
Страница 11: ...7 114 CE CATEGORY 5 7 CABINS A 8 PERSONS B 10 PERSONS C 12 PERSONS D 12 PERSONS 1 SPECIFICATIONS AND WARRANTY...
Страница 14: ......
Страница 16: ...12 114 POSITION OF THE LIFERAFT Note If over 10 persons on board 2 liferafts compulsory Liferaft to port...
Страница 24: ...20 114 EMERGENCY TILLER...
Страница 26: ......
Страница 27: ...23 114 HULL CONSTRUCTION MAINTENANCE OF THE HULL LIFTING INSTRUCTIONS TO REPAIR THE GEL COAT 3...
Страница 28: ......
Страница 30: ...26 114 LIFTING Wetted area 32 2 m2 These measurements are for light boat A Water line B Deck line...
Страница 34: ......
Страница 35: ...31 114 DECK NAVIGATION MOORING LINES TOWING GROUND TACKLE MAINTENANCE OF THE DECK STEERING GEAR 4...
Страница 40: ......
Страница 44: ......
Страница 45: ...41 114 RIGGING AND SAILS STANDING RIGGING RUNNING RIGGING WINCHES SETTING THE SAILS SAILS 5...
Страница 60: ......
Страница 66: ......
Страница 67: ...63 114 ACCOMMODATIONS MAINTENANCE FABRICS 6...
Страница 68: ...64 114 2 CABINS...
Страница 72: ......
Страница 73: ...69 114 PLUMBING WATER TANK FILLING FRESH WATER SYSTEM GAS SYSTEM DRAINAGE SYSTEM SEWAGE 7...
Страница 76: ...72 114 THRU HULL FITTING THRU HULL FITTING CLOSED THRU HULL FITTING OPEN...
Страница 84: ......
Страница 88: ......
Страница 94: ......
Страница 102: ...98 114 ENGINE WATER INTAKE VALVE Thru hull fitting with engine water inlet valve...
Страница 106: ...102 114 STUFFING BOX Stuffing box 1 Anode 2 Propeller 3 P bracket 4 Propeller shaft 5 Stuffing box 6 Connecting device...
Страница 108: ......
Страница 109: ...105 114 LAUNCHING LAUNCHING RECOMMENDATIONS STEPPING THE MAST 10...
Страница 112: ......
Страница 113: ...109 114 WINTER STORAGE LAYING UP PROTECTION AND MAINTENANCE 11...
Страница 116: ......
Страница 118: ......