![JDS Uniphase ValidatorPRO-NT, Cu Скачать руководство пользователя страница 42](http://html1.mh-extra.com/html/jds-uniphase/validatorpro-nt-cu/validatorpro-nt-cu_user-manual_3587438042.webp)
Auto Test
38
Alternatively, the job file can be transferred from USB thumb
drive to internal memory (eliminating the need to leave the
USB thumb drive plugged in while running tests.)
9.1 Cable Test Schedule
The Cable Test Schedule displays all the individual cable
runs associated with the open job. The open job is displayed
at the top left corner of the display. For each cable, its ID,
Type, the “from” and “to” are displayed along with the Test
Result. If the cable has not been tested a question mark (?)
will be displayed in the Result column.
Figure 9.2: Cable Test Schedule
To test a cable on the list, highlight the Cable ID you wish to
test. Attach that cable to the appropriate connector on the
main unit. Attach the remote unit to the other end of the
cable you wish to test.
With the remote connected to the cable, the test function can
be started by pressing the TEST button. You will hear relays
switching in the main unit and remote. A link is established
with the remote, and ValidatorPRO-NT, Cu begins testing
the cable to the parameters that have been defined for its
type.
Содержание ValidatorPRO-NT, Cu
Страница 1: ...User s Guide ValidatorPRO NT Cu www jdsu com know ...
Страница 2: ......
Страница 8: ......
Страница 12: ...About Your ValidatorPRO 8 2 2 Remote Unit Features Figure 2 2 Remote Unit Features ...
Страница 18: ...Integration with Plan Um Software 14 Please refer to the auto test menu section for further details ...
Страница 20: ......
Страница 30: ......
Страница 36: ......
Страница 50: ......
Страница 56: ......
Страница 66: ......
Страница 70: ...www jdsu com know Document Information Doc 21160445 Revision 000 English ...