Next-Generation Banknote Acceptor Unit
S e c t i o n 2
This section provides installation and operating
instructions for the iVIZION
®
Series Next-Genera-
tion Banknote Acceptor Unit. The information
within this section contains the following features:
•
Installation Procedure
•
DIP Switch Configurations
•
Connector Pin Assignments
•
Preventive Maintenance
•
Cleaning Procedure
•
Standard Interface Circuit Schematics
•
Operation Flowcharts
Installation Procedure
Mounting holes are provided in each Frame Unit to
attach the iVIZION to a related Machine during
installation. Select and perform the following steps
to install the iVIZION Unit in the related
Machine’s particular Frame configuration:
1. Install the Interface Harness to the Frame
Grounding Plate (FG PLT) (Figure 2-1
a
) using
the two (2) Floating Collars (Figure 2-1
b
), the
single (1) M2.6x12 W Washer Screw (Figure 2-1
c
), the single (1) M2.6x10 W Washer Screw (Fig-
d
) and the single (1) M2.6 Nylon Nut
e
) onto the Frame Assembly. See the
Figure 2-1 circled inset to visually see the assem-
bly completed as required.
2. When a side mounting configuration is preferred,
bolt the left and right side of the
iVIZION
Frame into its intended
related Machine’s
loca-
tion using six (6) M4 Screws on both sides of the
Frame (3 Screws on each side as shown in Figure
3. When an end mounting configuration is pre-
ferred, remove the Cash Box and attach the rear
end of the
iVIZION
Frame into its intended
location using four (4) UNC6-32 Flat Head
Screws from inside the back end of the Frame as
shown in Figure 2-3.
2 INSTALLATION
Figure 2-1
Interface Harness Installation Loca-
a
b
b
c
d
e
Figure 2-1
Interface Harness Installation Location
Figure 2-2
M4 Screws Locations (Left/Right
Figure 2-2
M4 Screws Locations (Left/Right Side)
Figure 2-3
Flat Head Screws Locations (Rear
Figure 2-3
Flat Head Screws Locations