Maintenance Manual
WBA Series
QA-IF006 R02E Wartungsanleitung WBA_newLogo.doc
Japan Cash Machine Germany GmbH
Page 8 of 16
Thorough cleaning and checking is recommended every eight to twelve months.
The intervals are shorter under unfavourable conditions.
Procedure:
1. Remove the head as well as the carrying unit
(fig 06 and 07)
Fig. 06
Fig. 07
2. Check for any superficial damages
Again check for damages in the cog wheels etc. Damaged parts need to be
changed. The acceptor can also be sent to JCM-G.