Operation
Working with the Excavator Arm
70
9821/6100-4
70
6. Swing the bucket back to the excavation and start the next dig.
Backfill the excavation by loading the bucket with soil from the pile. Do not push the soil with the side of the
bucket.
Moving the Machine While Digging
When digging a trench or hole which is longer than the excavator's reach, dig to the required depth and width
until it is not possible to dig any closer without contacting the machine.
Figure 60.
When this position is reached, move the machine a suitable distance away from the excavation.
Figure 61.
Lower the dozer blade until the machine is level, then continue digging.
Содержание 8014 CTS
Страница 2: ......
Страница 4: ...9821 6100 4 Notes...
Страница 12: ...Notes viii 9821 6100 4 viii...
Страница 18: ...Notes 6 9821 6100 4 6...
Страница 30: ...Notes 18 9821 6100 4 18...
Страница 41: ...Operation Entering and Leaving the Operator Station 29 9821 6100 4 29 Figure 15 A A Glazing breaker...
Страница 45: ...Operation Windows 33 9821 6100 4 33 Figure 21 A B A Latch B Frame...
Страница 98: ...Notes 86 9821 6100 4 86...
Страница 136: ...Maintenance Service Points 124 9821 6100 4 124 Cab and Exterior Figure 98 R S R Track gearbox S Track tensioner...
Страница 207: ...Technical Data Warranty Information 195 9821 6100 4 195 Figure 154 11000h 132 Month h...
Страница 208: ...Notes 196 9821 6100 4 196...