36
Rigging Manual
9.2 COLLAPSE THE ARRAY AND MOVE THE PINS TO THE STORAGE POSITION
1
2
4
3
5
STEPS:
• Lower the array until the front wheels touch the ground. The array should start to roll backwards and, as the array is lowered,
the cabinet-to-cabinet angles of the bottom five cabinets will close to the 12˚ position.
• Once the lowest four boxes are entirely collapsed, and the gap between the fourth and fifth cabinets (from the bottom) is
closed, work from the bottom cabinet up and set the link bars of the lowest four cabinets to the 12˚ STORAGE position.
• Remove the rear link pin from the fifth cabinet. This pin should move easily, as the weight of the array is being held by the front
wheels of the VT or Case resting on the ground.
• Raise the array and allow the four cabinets to roll forward until the cart is resting safely on all four wheels.
• Remove the front pins and separate the suspended array from the stack on the VT cart.
1
2
3
4
5
Содержание SRX900 Series
Страница 1: ...Rigging Manual...
Страница 38: ...38 Rigging Manual...
Страница 46: ...46 Rigging Manual 11 5 GROUND ST ACK EXAMPLES SRX910LA BP SRX928S SRX910LA SRX906LA BP SRX918S SRX906LA...
Страница 50: ...Rigging Manual...