3-3
Section 3 Components
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
付録
3.2.2 Front view
No.
Name
Function outline
(1)
Power switch
Turns power on and off.
(2)
LED
Indicates the equipment status.
The meanings and sequence of the LEDs are described in [Appendix
G].
3.2.3 Rear view
No.
Name
Function outline
Supplement
(1)
GPS/GYRO
connector
Connects GPS and GYRO
Maximum cable length: 1 km
(complies with NMEA)
Conversion cable for serial
communication and power
control is attached.
(2)
Modem connector
Connects VLAN Switching Hub.
Connector shape: RJ-45
Maximum cable length:100 m
LAN Standard: 100Base-T
(3)
BUC I/O Connector Connects X7 Modem BUC connecter
(1)
(9)
(8)
(2)
(3)
(4)
(5)
(6)
(7)
(1)
(2)
Содержание JUE-60KA
Страница 2: ......
Страница 18: ...xvi...
Страница 27: ...1 5 Section 1 Telenor Thor7 systems 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27...
Страница 28: ......
Страница 36: ...Section 2 Introduction of the JUE 60KA 2 8...
Страница 38: ...Section 3 Components 3 2 3 2 Below Deck Equipment BDE 3 2 1 Appearance 3 2 1 1 Front view 3 2 1 2 Rear view...
Страница 44: ......
Страница 52: ...Section 4 Setup 4 8 4 Restart the equipment to reflect the setting change...
Страница 106: ...Section 6 Maintenance 6 2...
Страница 108: ...Section 7 After sales service 7 2...
Страница 110: ...Section 8 Specification 8 2...
Страница 120: ...Appendix B Software Upgrading Procedure B 8...
Страница 122: ...Appendix C Initializing the settings to the factory default state C 2...
Страница 124: ...Appendix D List of Initial Values App 0100 D 2...
Страница 134: ......
Страница 142: ...Appendix G Abbreviations and Glossary G 4...
Страница 144: ...Appendix H JRC Network H 2...
Страница 145: ......