17
2.0 Service
2.1 Grease Conveyer Bearings
Grease the conveyor bearings every 10 hours of operation and before storage. Use only two pumps of grease per
bearing (Figure 2.1).
NOTE: Over lubrication of these bearings will result in premature failure.
NOTE: The conveyor has four bearings that need grease (two at each end).
2.2 Grease Boom Arm
Grease pivot points on boom arm every 50 hours and before storage (Figure 2.2).
Figure 2.1
Grease Point
Figure 2.2
Содержание SpeedTender 500ST
Страница 5: ...5 Notes ...
Страница 34: ...34 6 Spool Valve 37 38 39 40 36 ...
Страница 50: ...50 Miscellaneous ...