IS255
‐
21A
J
&D
Manufacturing
•
Eau
Claire,
WI
54701
•
1
‐
800
‐
998
‐
2398
•
www.jdmfg.com
P a g e
|
5
Chapter
2
‐
Temperature
Sensor
Installation
Placing
the
Temperature
Sensors
Place
the
temperature
sensor
in
the
middle
of
the
barn
or
in
a
location
which
represents
the
barns
average
temperature.
Note:
It
is
important
to
not
allows
sensors
to
come
into
contact
with
direct
sunlight
Extending
the
Temperature
Sensor
The
sensor
that’s
included
is
10
feet
long.
If
you
extend
it,
do
the
following:
1.
Run
a
length
of
18
‐
24
AWG
wire
(twisted
or
shielded
if
possible)
from
the
temperature
sensor
to
the
JDN4
‐
5.
Keep
the
sensor
wire
away
from
high
voltage
wire
by
at
least
1
foot.
2.
Solder
or
use
gel
filled
crimps
to
connect
the
wires
to
the
temperature
sensor.
3.
After
connection
is
complete,
make
sure
it
is
waterproof.
4.
Connect
the
temperature
sensor
to
the
JDN4
‐
5
as
shown
below
in
Image
2
:
Image
2
Содержание JDN4-5
Страница 2: ......
Страница 17: ...IS255 21A J D Manufacturing Eau Claire WI 54701 1 800 998 2398 www jdmfg com P a g e 15 ...
Страница 18: ...IS255 21A J D Manufacturing Eau Claire WI 54701 1 800 998 2398 www jdmfg com P a g e 16 ...
Страница 19: ...IS255 21A J D Manufacturing Eau Claire WI 54701 1 800 998 2398 www jdmfg com P a g e 17 SECTION 2 USER GUIDE ...