IS297-22F
J&D Manufacturing • 6200 Hwy 12 • Eau Claire, WI 54701 • 1-800-998-2398 • www.jdmfg.com
Page 7/27
• Line up the holes of the motor mount brackets to the holes in the motor housing.
• Assemble the
(8) 3/8”-16 x 3/4“
Bolts
and (8) 3/8”
Washers from Bag 3 (Motor)
• Starting each bolt and washer assembly
by hand
, begin attaching motor to brackets
- since motor has an aluminum housing
care must be taken to not cross-thread or
strip-out the motor mounting threads
• Once all motor mounting hardware has been hand started, torque the bolts to 23 ft-lbs
using hand tools only
7
Prop Installation:
• Insert the
1/4” x 2”
Machine Key from Bag 4 (Motor Key & Louver Hardware)
into the
keyway on the motor shaft
• Slide prop onto the keyed motor shaft until flush with end of motor shaft.
• Secure prop by tightening the (2) set screws (located on underside of prop) to 10 ft-lbs
• Rotate the blade to make sure there is no interference.
8