— 15 —
Step 3: Verifying Camera Operation
When power is supplied to the camera while the necessary equipment is connected, the
POWER/TRIG LED at the rear of the camera lights amber, and initialization of the camera
starts.When initialization is complete, the POWER/TRIG LED lights green.
Verify whether power is being supplied to the camera by checking the rear LED.
When properly turned on
Lit green
* For details on how to read the LEDs, see “LED status and camera status” in the “Parts
Identification” section.
Step 4:
Verifying the Connection between the Camera and PC
Verify whether the camera is properly recognized via Control Tool.
Connecting the Camera to Control Tool
1
Startup eBUS Player for JAI
eBUS Player for JAI startup screen appears.
eBUS Player for JAI
Go-X Series GigE Vision I/F
Содержание GOX-2402M-PGE
Страница 79: ...Go X Series GigE Vision I F Spectral Response GOX 2402MC PGE 79...
Страница 80: ...80 Spectral Response GOX 3201MC PGE Go X Series GigE Vision I F...
Страница 81: ...81 Spectral Response GOX 5103MC PGE Go X Series GigE Vision I F...
Страница 82: ...Go X Series GigE Vision I F Spectral Response GOX 8901MC PGE 82...
Страница 83: ...Go X Series GigE Vision I F Spectral Response GOX 12401MC PGE 83...
Страница 84: ...84 Dimensions Dimenstional tolerance 0 3mm Unit mm Go X Series GigE Vision I F...
Страница 88: ...88 Revision Date Changes Revision history Go X Series GigE Vision I F...