![JAI GO-5100MP-PGE Скачать руководство пользователя страница 14](http://html.mh-extra.com/html/jai/go-5100mp-pge/go-5100mp-pge_user-manual_631472014.webp)
— 14 —
Step 3: Verifying Camera Operation
When power is supplied to the camera while the necessary equipment is connected, the
POWER/TRIG LED at the rear of the camera lights amber, and initialization of the camera
starts.When initialization is complete, the POWER/TRIG LED lights green.
Verify whether power is being supplied to the camera and whether the camera is connected
to the network by checking the rear LEDs.
During normal status
* For details on how to read the LEDs, see “LED status and camera status” in the “Parts
Identification” section.
Step 4: Verifying the Connection between the Camera
and PC
Verify whether the camera is properly recognized via eBUS Player for JAI.
Connecting the Camera to eBUS Player for JAI.
1
Startup eBUS Player for JAI
eBUS Player for JAI startup screen appears.
GO-5100MP-PGE
⑥
DC IN / trigger IN connection cable
⑦
AC adapter (power supply) (if necessary)
Connect the AC adapter and the round connector of the connection cable to the DC IN /
trigger IN connector on the camera.
Lit green
Lights or blinks according
To the network status
Note
Initialization of the camera will not complete unless it is connected to the network. If the
power / trigger LED does not switch to green within minutes of supplying power, check the
LAN cable and other connections. After initialization is completed once, the power / trigger
LED will remain green, even if the network is disconnected.