Era™ Freestanding Bath
Era™ Freestanding Bath
Installation and Operation
www.jacuzzi.com
Page 9
English
Step 3
Double Ended Base Installation
Ball and Claw Feet Attachment
X
X
Turn the bath upside down on a protective covering and attach the four
(4) feet the four feet (Figure 8).
X
Y
Using a flat washer, lock washer and hex head bolt, attach the metal
frame to the bath tub. Repeat this step for the remaining three (3) feet.
X
Z
Once all four (4) feet have been installed, use an Allen wrench
(supplied) and tighten all mounting hardware.
X
[
Place the bath upright on the protective covering.
Figure 8.
Ball and Claw Feet Installation
It is strongly recommended that two people perform the following steps.
Bathtub
Rubber Gasket
Flat Washer,
Lock Washer and
Hex Head Bolt
Step 1
Before installing the Double Ended Bathtub, please make sure that the permanent location of the Double Ended
bathtub has been determined.
It is strongly recommended that a licensed plumber perform all plumbing and plumbing assembly procedures.
Figure 9.
Mounting Hole Mark
Notch Cutout
Pencil
Step 2
Installation
X
X
Place the Double Ended bathtub in the pre-determined permanent
location.
X
Y
Using a pencil, mark on the ground where the notch cutout is on
the inside of each ball and claw foot (Figure 9). This will be where
the mounting hole will be drilled in the floor. Repeat this step for the
remaining locations.
X
Z
With the help of an assistant, gently lift the Double Ended bathtub and
place it to the side.
X
X
At each marked location, drill a " hole 1½" in depth (Figure 10).
Repeat this step for the remaining locations.
X
Y
When complete, clean the drilled hole of all debris.
X
Z
Insert the anchor into the drilled hole. If necessary, use a hammer and
gently tap the anchor into place.
X
[
Thread the shaft into the anchor. If needed, a screwdriver maybe used.
Leave ⅜" of the shaft exposed (Figure 10).
X
\
Repeat the previous two steps for the remaining locations.
716
Figure 10.
Drilling the Mounting Hole
Shaft
Anchor
Double Ended Bathtub Placement
X
X
Center the bathtub with the water supply lines that are
located on the floor.
X
Y
Measure 6" from the center of the water supply line to
the center of the bathtub drain opening (Figure 7).
Leave the double ended bathtub in this location and proceed
to the "Installation" section below.
It is strongly recommended that two people perform
the following steps.
Figure 7.
Securing the Bathtub
Step 1
6"
8" from the wall
(minimum)
5¾"
1" Diameter Hole
1½" Diameter Hole
Hot Water
Cold Water
Rim of Bathtub
Drain/Overflow Tube
Wall
Water Supply Lines