Era™ Freestanding Bath
Era™ Freestanding Bath
Installation and Operation
www.jacuzzi.com
Page 15
English
Pedestal
Leg
Step 3
Make sure the overflow opening on the bathtub and the drain
access on the base are on the same side before permanently
marking the mounting location.
X
X
Remove the pedestal base. Place the bathtub back in the
determined location. Make sure the overflow opening on the bathtub
is centered on the drain (Figure 28).
X
Y
Using a pencil, lightly outline the pedestal leg. Repeat this step for
the remaining three (3) pedestal legs.
Center
Point
Pencil
Bathtub
Figure 28.
Pedestal Leg Attachment
Step 4
X
X
At each marked location, drill a " hole 1½" in depth (Figure 29).
Repeat this step for the remaining locations.
X
Y
When complete, clean the drilled hole of all debris.
Figure 29.
Drilling the Mounting Hole
" Drill Bit
1½"
716
Step 5
X
X
Insert the wedge anchor into the drilled hole. If necessary, use a
hammer and gently tap the wedge anchor into place (Figure 30).
X
Y
Use a wrench to tighten the nut. Do not overtighten this nut. Tighten
the nut until it is firmly secured.
X
Z
Repeat the previous two steps for the remaining locations.
Figure 30.
Wedge Anchor Installation
Wedge
Anchor
Nut
716
Installation
Step 1
Figure 26.
Pedestal Base Placement
Step 2
X
X
Gently place the bathtub in the base.
X
Y
Make any necessary adjustments at this time. The bathtub must sit
evenly in the base.
X
Z
Using a pencil, outline the pedestal base, taking note where the
drain access is located (Figure 27).
X
[
Remove the bathtub.
It may be necessary to adjust the pedestal legs to be level for the
bathtub to fit properly in the base. Do that now, if necessary.
Figure 27.
Bathtub Placement
X
X
Center the opening on the pedestal base with the drain opening
(Figure 26).
Water Supply Lines
Bathtub
Base
Drain
Access
Pencil