6 OPERATION
26
How to calculate a slope:
Tools Required:
Level
(A)
, either 1 yard, or 1 meter long.
Tape measure
(B)
.
With the level
(A)
positioned horizontally, measure the
distance
(C)
with tape measure
(B)
. Use the chart to
calculate either the slope angle or the % grade of the
slope
(D)
.
Figure 6D
C
A
B
D
Height (C)
Result (D)
Inches with 1 Yard Level (A)
Millimeters with 1 Meter Level (A)
Slope in Degrees
Slope Grade
3
4.8
8.3
100
5.7
10.0
150
8.5
15
6
9.5
16.7
200
11.3
20.0
7.5
11.8
20.8
225
12.7
22.5
9
250
14
25.0
275
15.4
27.5
10
15.5
27.8
300
16.7
30.0
11
17.0
30.6
325
18.0
32.5
12
18.4
33.3
350
19.3
35.0
13
19.9
36.1
375
20.6
37.5
14
21.3
38.9
400
21.8
40.0
15
22.6
41.7
425
23.0
42.5
16
24
44.4
475
25.4
47.5
18
500
26.6
50.0
20
29.1
55.6
600
31.0
60.0
25
34.8
69.4
800
38.7
80.0
30
39.8
83.3
900
42.0
90
36
1000
45.0
100
Содержание Greens King IV Plus
Страница 48: ...9 ADJUSTMENTS 48 7 Engine drain plug 22 ft lb 29 7 N m...
Страница 59: ...NOTES 12 59 12 NOTES...
Страница 117: ...NOTAS 12 es 59 12 NOTAS...