![Jackson Delta HT-E-SEER-S Скачать руководство пользователя страница 18](http://html.mh-extra.com/html/jackson/delta-ht-e-seer-s/delta-ht-e-seer-s_installation-operation-and-service-manual_628857018.webp)
11
07610-004-54-86-D
INSTRUCTIONS
INSTALLATION
PROGRAMMING
CHEMICAL
FEEDER PUMPS
To access programming mode, machine must be ON and “READY” (between cycles).
The PROGRAM (PGM) light will be flashing.
1. Locate universal timer. On the timer, locate programming board and
programming buttons.
2. Programming board and buttons are not labeled on the timer. Use the graphic
below for reference.
3.
Press and hold both the MOVE and ENTER buttons simultaneously for two
seconds then release. PGM light will go steady and light A will start flashing.
8 7 6 5 4 3 2 1
ON
CHECK FUSE
1 2 3 4 5 6 7 8
ON
8
4
2
1
0.8
0.4
0.2
0.1
A
B
C
D
E
F
G
H
PGM
ACCEPT
MOVE
ENTER
IN
SEC
LIGHTS
TIME
BUTTONS
CHECK FUSE
1 2 3 4 5 6 7 8
ON
8
4
2
1
0.8
0.4
0.2
0.1
A
B
C
D
E
F
G
H
PGM
ACCEPT
MOVE
ENTER
IN
SEC
LIGHTS
TIME
BUTTONS
CHECK FUSE
Universal timer is
located above chemical
feeder pumps. Use Parts
section of this manual
for reference.
= Light Steady
= Light Flashing
X X X
0 0 0 0 0
8 7 6 5 4 3 2 1
DIP-switch Settings
(0 = On, X = Off)
←
ON