星火全自动缝纫控制系统使用说明书
Operation Instruction for Xing Huo Automatic Sewing Control System
78
Appendix II: Introduction to Quick Start
(1) Start the machine
After installing the equipment, plug in. Rotate or press the power switch, start the machine.
After showing the logo, it will enter the processing main interface, as described in Section
2.2.1. If the bobbin threads are needed to be winded, refer to Section 2.2.2.
(2) Set the processing files
Copy the processing files in .HLW (or .FLW) format generated by PC sewing editing
software to the U disk; insert U disk into the USB interface of equipment; In processing
main interface, click
- >
- >
to enter "U Disk File"
interface, click the file names to be processed to make them to become red, and then click
to copy to memory. Click
- >
to return to the processing main
interface. Select files to be processed on the left side, the processing pattern will be
previewed in central interface.
If you use "File Collection" function to generate processing file, see Chapter 4.
(3) Put in the template
Put cloth to be processed into the produced template, click
, click
again to
make presser frame in the rising state. Put the template under the presser frame, click
to make presser frame to decrease and press the template
(4) Align at base
See Section 2.2.4
(5) Start processing
In the processing main interface, press the start button and the machine starts processing
automatically according to the drawing. After the processing, it will return to the reset
origin or other set point automatically.
Note: