background image

4

2010-06/MU/OCT 3kG4 /001 / Ed. B

5

2010-06/MU/OCT 3kG4 /001 / Ed. B

STEP 1 - OCTANS 3000 GUIDED TOUR

Connecting OCTANS 3000 to PC and Mains

As soon as OCTANS 3000 is powered up, it starts its 5-minute alignment phase. During this alignment phase, heading 

and attitude data are available, but have not reached full accuracy (see figure 1). Specified accuracy on heading, roll and 

pitch is reached at the end of the 5 minutes long alignment phase. Heave initialization occurs at each OCTANS 3000 

powering on or soft restart. It is performed in parallel with the OCTANS 3000 alignment phase, but it is time set to 5 addi-

tional minutes. During the heave initialization phase, the heave, surge and sway outputs have not reached full accuracy.

Heading

and Attitude

Motion sensing

System Status

System init

/Alignment

System init

/Heave init

System OK

No output

Reliable

output

Reliable

output

Alignment phase

Heave

initialisation

Full accuracy output

Full accuracy

output

time in 

mn

0’     1’   

 

5’ 

 

 10’

        Figure 1 – OCTANS 3000 Starting Sequence (at powering-on or restart)

Warning: 

At any power supply outage, OCTANS 3000 restarts its initialization.

Содержание Octans 3000

Страница 1: ...Quick G Quick Start Guide Octans 3000 subsea gyrocompass and motion sensor...

Страница 2: ...the OCTANS 3000 and the basic configurations required before beginning the positioning Contents OBJECTIVE 01 CONTENTS 01 CONVENTIONS 02 OCTANS 3000 SYSTEM OVERVIEW 03 VERIFICATION OF PACK CONTENTS 03...

Страница 3: ...me computation The heading search algorithm has been designed by IXSEA Heading and attitudes are computed whether the system is in movement or not and without an external reference point Computation i...

Страница 4: ...ccurs at each OCTANS 3000 powering on or soft restart It is performed in parallel with the OCTANS 3000 alignment phase but it is time set to 5 addi tional minutes During the heave initialization phase...

Страница 5: ...e Environment 1 6 and higher The Control Pages opens During the first seconds the IXSEA logo is flashing grey blue indicating that the Web based User Interface is loading the internal configuration of...

Страница 6: ...o changes and the detailed status pop up automatically appears showing immediately which equipment has raised the problem Table 1 Color code definition General Rules for Using Command Windows The comm...

Страница 7: ...the hidden area by clicking on its text label title OK Cancel buttons Each command page contains the same buttons they appear as soon as a modification or a selection has been made in the command page...

Страница 8: ...tput data the serial parity baud rate standard RS232 or RS422 and stop bit or Ethernet transport layer IP ad dress Port number parameters the pulse output to output the envelop the heave fil ter to us...

Страница 9: ...apidly If the latitude information input is incorrect OCTANS 3000 will produce an error Important OCTANS 3000 is delivered with a default latitude setting that corresponds to IXSEA s factory location...

Страница 10: ...NIT UPDATE option of SETUP menu to open the INIT UPDATE page Enter the correct value in the Latitude field Click OK button to save the modification into OCTANS 3000 PROM Step 4 Click on maintenance me...

Страница 11: ...direct connection to the 24V power supply with banana pins Connection to PC Use the 19 pin test cable for direct connection to the workstation Input output Ports Use the 19 pin test cable The pin ass...

Страница 12: ...southern hemisphere 4 Click on OK button 5 End of procedure Configuring the Inputs Outputs Up to five inputs outputs are available A B C D and E For each input output you can define the following par...

Страница 13: ...input port is not connected 3 Configure the relevant parameters of the selected port by choosing them in the various drop down lists of the Protocol Physical Link Serial or Ethernet areas 4 Click on O...

Страница 14: ...f necessary choose the Heave filter to apply for more detail see Part 2 of your OCTANS 3000 manual 7 Click on OK button 8 End of procedure OCTANS 3000 is now ready for positioning STEP 3 more The prev...

Страница 15: ...refer to Part 2 of the OCTANS 3000 User Guide Pulse Input Output Three pulse Inputs and one pulse output are available on OCTANS 3000 For more details about The pulse connector pins refer to Part 2 o...

Страница 16: ...a com You can also contact IXSEA headquarters in France or one of its representatives around the Contact Phone Fax IXSEA SAS France 33 0 1 30 08 98 88 33 0 1 30 08 88 01 IXSEA BV The Netherlands 31 0...

Страница 17: ...30 2010 06 MU OCT 3kG4 001 Ed B 31 2010 06 MU OCT 3kG4 001 Ed B PERSONAL NOTES PERSONAL NOTES...

Страница 18: ...32 2010 06 MU OCT 3kG4 001 Ed B PERSONAL NOTES...

Отзывы: