background image

18

2010-06/MU/OCT 3kG4 /001 / Ed. B

19

2010-06/MU/OCT 3kG4 /001 / Ed. B

STEP 2 - ONBOARD INSTALLATION

Mechanical Installation

OCTANS 3000 is installed using six M6 screws accessible from the top of the unit (see Figure 2). 

Recommendations and Note

 Temperature in operation must be in the range  -20 °C to 55 °C

 The dimensions of the OCTANS 3000 housing are ((l x 

Ø

) in mm ):374 x 213. There must be enough place for the wire  

  way on the connector side of OCTANS 3000.

 The weight of OCTANS 3000 is 14.6 kg in air and 4.65 kg in water.

Figure 2 – Definition of OCTANS 3000 Reference Frame (X1,X2, X3) and P center of measurements 

Electrical Connections

All OCTANS 3000 inputs/outputs are made using sealed connectors, SEACON plug type.

In the standard case described below, all connections are Ethernet ones.

  •

 Power Supply: Use the 19-pin test cable for direct connection to the 24V power supply with banana pins.

  •

 Connection to PC: Use the 19-pin test cable for direct connection to the workstation

  •

 Input/output Ports: Use the 19-pin test cable 

The pin assignment of the Ethernet connector are described hereafter:

Pin

Signal

Pin

Signal

1

Ext sensor 1 In  (+V1)

11

Pulse B: OUT TTL

2

Ext sensor 1 In GND (0/ +V1 V)

12

Ext Pulse IN -

3

Ext sensor 2 In (+V2)

13

GND_B

4

Ext sensor 2 In GND (0/+V2 V)

14

Shield Ethernet

5

Repeater : 

RS232 TX(+) 

15

Ethernet TX(+)

6

Repeater :

 RS232 RX(+)

16

Ethernet TX(-)

7

Ext Pulse IN +

17

Pulse B: IN TTL

8

OCTANS 3000 Power In (+24 V)

18

Ethernet RX(+)

9

OCTANS 3000 Power In GND (0/24 V) 

19

Ethernet RX(-)

10

Repeater : GND_R

If Ethernet connection is not possible you can use the serial connector. In this case the workstation will establish a PPP 

connection with OCTANS 3000. 

refer to OCtaNS 3000 User Manual to know how to configure this ppp connection.

1.

4.

13.

17.

.3

.7

.16

.19

Power

supply

Input/Output

Communication with

workstation

SEACON MINK-FCR, size K 19#22

Figure 3 -  Ethernet connector

Содержание Octans 3000

Страница 1: ...Quick G Quick Start Guide Octans 3000 subsea gyrocompass and motion sensor...

Страница 2: ...the OCTANS 3000 and the basic configurations required before beginning the positioning Contents OBJECTIVE 01 CONTENTS 01 CONVENTIONS 02 OCTANS 3000 SYSTEM OVERVIEW 03 VERIFICATION OF PACK CONTENTS 03...

Страница 3: ...me computation The heading search algorithm has been designed by IXSEA Heading and attitudes are computed whether the system is in movement or not and without an external reference point Computation i...

Страница 4: ...ccurs at each OCTANS 3000 powering on or soft restart It is performed in parallel with the OCTANS 3000 alignment phase but it is time set to 5 addi tional minutes During the heave initialization phase...

Страница 5: ...e Environment 1 6 and higher The Control Pages opens During the first seconds the IXSEA logo is flashing grey blue indicating that the Web based User Interface is loading the internal configuration of...

Страница 6: ...o changes and the detailed status pop up automatically appears showing immediately which equipment has raised the problem Table 1 Color code definition General Rules for Using Command Windows The comm...

Страница 7: ...the hidden area by clicking on its text label title OK Cancel buttons Each command page contains the same buttons they appear as soon as a modification or a selection has been made in the command page...

Страница 8: ...tput data the serial parity baud rate standard RS232 or RS422 and stop bit or Ethernet transport layer IP ad dress Port number parameters the pulse output to output the envelop the heave fil ter to us...

Страница 9: ...apidly If the latitude information input is incorrect OCTANS 3000 will produce an error Important OCTANS 3000 is delivered with a default latitude setting that corresponds to IXSEA s factory location...

Страница 10: ...NIT UPDATE option of SETUP menu to open the INIT UPDATE page Enter the correct value in the Latitude field Click OK button to save the modification into OCTANS 3000 PROM Step 4 Click on maintenance me...

Страница 11: ...direct connection to the 24V power supply with banana pins Connection to PC Use the 19 pin test cable for direct connection to the workstation Input output Ports Use the 19 pin test cable The pin ass...

Страница 12: ...southern hemisphere 4 Click on OK button 5 End of procedure Configuring the Inputs Outputs Up to five inputs outputs are available A B C D and E For each input output you can define the following par...

Страница 13: ...input port is not connected 3 Configure the relevant parameters of the selected port by choosing them in the various drop down lists of the Protocol Physical Link Serial or Ethernet areas 4 Click on O...

Страница 14: ...f necessary choose the Heave filter to apply for more detail see Part 2 of your OCTANS 3000 manual 7 Click on OK button 8 End of procedure OCTANS 3000 is now ready for positioning STEP 3 more The prev...

Страница 15: ...refer to Part 2 of the OCTANS 3000 User Guide Pulse Input Output Three pulse Inputs and one pulse output are available on OCTANS 3000 For more details about The pulse connector pins refer to Part 2 o...

Страница 16: ...a com You can also contact IXSEA headquarters in France or one of its representatives around the Contact Phone Fax IXSEA SAS France 33 0 1 30 08 98 88 33 0 1 30 08 88 01 IXSEA BV The Netherlands 31 0...

Страница 17: ...30 2010 06 MU OCT 3kG4 001 Ed B 31 2010 06 MU OCT 3kG4 001 Ed B PERSONAL NOTES PERSONAL NOTES...

Страница 18: ...32 2010 06 MU OCT 3kG4 001 Ed B PERSONAL NOTES...

Отзывы: