- 5 -
1. Unpacking and inspection
Iwaki Magnet Pump
MODEL
HEAD
CAPACITY
MFG.No.
(m)
(
r
/min)
IWAKI CO.,LTD.
TOKYO
JAPAN
2P403846
1
kW
Hz
rpm
After unpacking, check the following points to confirm that
the delivered product and its accompanying parts and
elements are exactly what you ordered.
[1] Do the model and frequency indicated on the nameplate
conform to your order?
[2] Prior to the installation of the MDF-L
M
KK pump
(using SiC liner ring and mouth ring), remove the
cardboard pad inserted inside the suction port.
[3] Has the pump unit or any part of it been damaged or
bolts and nuts been loosened during delivery?
2. Description on body and label
Pump unit (liquid feeding section)
No self priming: Before operating the pump,
feed liquid through the suction
or dischargeside port.
Motor nameplate
Use only the power voltage specified on the
nameplate. (Follow applicable local power
regulations.)
"Rotation" indicator label
The arrow indicates the rotating
direction of the motor.
Always make sure that the motor
runs in the direction the arrow
indicates. (Refer to chapter
"Operation".)
Motor (Driver)
This motor provides power to the
pump unit.
Base
Pump should be fixed firmly.
Discharge port
Suction port
Drain port
Drain the discharged liquid into a
suitable container and follow the
applicable local regulations in
disposing of the liquid. Never
allow the discharged liquid to
flow directly onto the ground.
"Never Run Pump Dry" label
Operating the pump without liquid will cause damage inside the
pump. Never operate the pump without liquid. (Refer to pump
model code
u
.)
CAUTION
When cleaning the pump, do not wipe the labels or the pump body with
solvent.
Pump specification nameplate
Pump must be operated according to
the specified conditions.