Page 8 (44)
Ver 2_en_2022-06-27
Assembly Instructions
Envistar Top
ivprodukt.docfactory.com
Order Portal
Nor does the declaration apply to other plant in which the unit forms a part. The product may
not be put into service until the plant in which it is included complies with the requirements for
CE marking.
Manufacturer
The air handling unit is manufactured by:
IV Produkt AB, Sjöuddevägen 7, SE-350 43 VÄXJÖ
Warranty
For proper function and for the warranty to be valid, the assembly instructions must be
followed.
Extended warranty
Extended warranty is a supplement to the order and to claim extended warranty (5 years),
according to ABM 07 with Appendix ABM-V 07 or according to NL 17 with Appendix VU 20, a
complete documented and signed IV Produkt Service and Warranty book must be presented.
Disclaimer
Continuous product development may give rise to specification changes without notice.
1.4
Receive, unpack
Check the goods on arrival, to ensure that no damage has occurred during transport.
When delivered, the product is packaged with plastic to protect against rain and dirt. The
packaging should be kept on as long as possible to avoid penetration of dirt and dust into the
unit. Duct connections on outdoor units are protected with a sheet metal covering.
1.5
Storage, transport
For temporary storage, the product should be placed on a flat surface, in a dry environment.
The original packaging should be unbroken. Condensation water, which can occur during
storage in fluctuating temperatures, normally dries up when the unit is installed and in opera-
tion. For extended periods of storage outdoors, the packaging should be opened to ensure
ventilation inside the parts. The parts of the unit should be protected from rain, snow and
sunlight.
1.6
Lifting the unit, unit parts
Lifting should be carried out according to lifting instructions in this document,
"4 LIFT THE
UNIT”, page 14
as well as according to markings and signs on the unit. If there are no lifting
instructions or markings, lifting must be carried out according to lifting methods prepared by
the transport industry.
1.7
After the lifetime of the product
For dismantling and decommissioning of air handling units, follow the instruction “Air handling
unit, dismantling and decommissioning” on
IV Produkt’s order portal
. See
"2.1 IV Produkt’s
order portal, support”, page 9.
Содержание Envistar Top
Страница 1: ...Assembly Instructions Envistar Top Size 04 21 Translation of the original instructions ...
Страница 2: ......
Страница 42: ...Page 42 44 Ver 2_en_2022 06 27 Assembly Instructions Envistar Top ivprodukt docfactory com Order Portal ...
Страница 43: ...Page 43 44 Ver 2_en_2022 06 27 Assembly Instructions Envistar Top ...