8
Chargemaster Pinner
5200710 Rev. H
3. Slide bracket into the mounting channel molded into the rear of the charging
bar (see
Figure 5
) then lock bracket in place using provided set screws.
4. Secure the charging bar to the machine frame. Tighten nylon nut hand-tight
plus ¼-turn only. DO NOT OVER TIGHTEN MOUNTING NUTS.
Mounting With 1/4” Hardware
1. Determine how many of the mounting
holes will be used (note: it is not
required to use all six) in mounting.
2. Drill clearance holes in each side of the
machine frame to accommodate 1/4”
hardware.
3. Slide bracket into the mounting
channel molded into the rear of the
charging bar (see
Figure 5
) then lock
bracket in place using provided set
screws.
4. Secure the charging bar to the machine
frame using 1/4” hardware. DO NOT
OVER TIGHTEN MOUNTING
HARDWARE.
Installing High Voltage Cables
CAUTION
–
ELECTRICAL SHOCK HAZARD
Turn off power supply before connecting high voltage cable.
1. Route the high voltage cables attached to each charging bar along the machine
frame or wall to the power supply.
2. Cable supports are used to guide the cables back to the power supply. All cables
must be kept a minimum of 1/4” away from machine frame and parts, walls
and ceilings. If this is not possible, encase cables in plastic insulating tubing
(available from Simco-Ion).
3. Ensure that the power supply is de-energized, and then remove the protective
plastic plug from the power supply high voltage connection by gently prying
with an insulted screwdriver.
4. Install spring loaded cable connectors on the free end of each cable, as described
on the enclosed SL instruction sheet.
5. Insert the cable (with spring loaded connector attached) into the power supply
high voltage connection. Screw in the knurled plug to secure the cable.
NOTE
– FINGER TIGHTEN ONLY.
Figure 5