
Integrated Valve
Section 4: Installation
Page 22 of 86
5760-107 Operations Manual Rev C
Configuring the IDS
1. Remove the IDS cover.
2. Install cables through
their respective bulk-
head fittings, leaving ¼"
of the large cable jacket
extending outside the
bulkhead fitting.
3. Connect the beacon
cable to IDS circuit
board connector J5.
Connect the level
detect cable (from ink
cap assembly) to J4.
(See the wiring diagram
in
Appendix B, Theory
of Operation
.) Connect
the ethernet cable to
the appropriate recep-
tacle.
4. Tighten bulkhead fit-
tings by hand, then ½
turn with a wrench, and
replace the IDS cover.
5. Place the Ink Status Beacon where it can be seen by plant personnel, and attach it to
bracketry with a T-nut.
Attaching Ink Regulators
1. Attach a single T-nut loosely to the bottom
side of the regulator bracket.
2. Slide the regulator bracket and T-nut into
the slotted bar and tighten into place.
Filter
Ink Inlet
To Printer
Ink Out
Ink Low Level Detect
Power Cord
Ethernet
Beacon
IDS CONNECTIONS
Regulator
Bracket
Regulator
Содержание Diagraph IJ3000
Страница 2: ......
Страница 8: ...Integrated Valve Page iv of iv 5760 107 Operations Manual Rev C ...
Страница 10: ...Integrated Valve Section 1 Introduction Page 2 of 86 5760 107 Operations Manual Rev C ...
Страница 12: ...Integrated Valve Section 2 Safety Page 4 of 86 5760 107 Operations Manual Rev C ...
Страница 22: ...Integrated Valve Section 3 System Components Page 14 of 86 5760 107 Operations Manual Rev C ...
Страница 42: ...Integrated Valve Section 5 Frequently Asked Questions Page 34 of 86 5760 107 Operations Manual Rev C ...
Страница 60: ...Integrated Valve Section 7 Troubleshooting Page 52 of 86 5760 107 Operations Manual Rev C ...
Страница 62: ...Integrated Valve Appendix A System Specifications Page 54 of 86 5760 107 Operations Manual Rev C ...
Страница 72: ...Integrated Valve Appendix B Theory of Operation Page 64 of 86 5760 107 Operations Manual Rev C ...
Страница 76: ...Integrated Valve Appendix C Parts and Supplies Page 68 of 86 5760 107 Operations Manual Rev C ...
Страница 90: ...Integrated Valve Appendix G Testing an Electrical Outlet Page 82 of 86 5760 107 Operations Manual Rev C ...
Страница 92: ...Integrated Valve Appendix H Electrostatic Discharge ESD Page 84 of 86 5760 107 Operations Manual Rev C ...