Integrated Valve
Section 4: Installation
Page 16 of 86
5760-107 Operations Manual Rev C
Testing the Electrical Outlet
CAUTION:
The outlet must be installed near the equipment and must be easily accessible.
ATTENTION:
On doit installer à côté de l'appareil une prise de courant facilement accessi-
ble.
Before installing the IJ3000 system, verify the integrity of the 115VAC sourced power, in
accordance with the National Electric Code (NEC) and approved local electrical codes. If
using a standard AC outlet, use the following procedure to verify the integrity of your outlet.
1. Place an outlet tester into the socket. (You can purchase an outlet tester at most hard-
ware stores).
2. If the outlet tester indicates that the outlet is wired correctly, proceed with the installa-
tion.
3. If the outlet tester indicates that the outlet is wired incorrectly, inform plant maintenance
immediately and do not use the outlet until it has been re-wired. See
Appendix G, Test-
ing an Electrical Outlet,
for more information.
Electrical Line Transients
Transients on the incoming AC power line can be in the form of voltage spikes and tran-
sients, over- and under-voltage events, or noise caused by poor grounding or interference.
Symptoms of power related problems can be unexplained loss of controller memory (loss
of message), garbled print, and unexplained hardware resets.
The best way to eliminate these types of problems is to install the controller on a dedicated
line with a line conditioner. A dedicated line refers to an AC line that only the system com-
ponents are plugged in to. This is most effective when the source is at the building main
service entrance.
Good quality line conditioners will provide protection against all AC line problems with the
exception of power outages; if power outages are a problem at the installation, an uninter-
ruptible power supply (UPS) should be installed.
CAUTION:
Not for use in a computer room as defined in the Standard for the Protection of
Electronic Computer/Data Processing Equipment, ANSI/NFPA 75.
ATTENTION:
Ne peut être utilissé dans une salle d'ordinateurs telle que définie dans las
norme ANSI/NFPA 75 Standard for Protection of Electronic Computer/Data Processing
Equipment.
Materials Required for Installation
You will need the following items:
•
Bottle of conditioner
•
Lint-free wipes
•
Ink pressure gauge (5700-743)
•
Safety goggles
•
Level
•
Tape measure
•
Effluent bottle (5700-734)
Use appropriate safety equipment and procedures. Leave print heads in their shipping car-
tons until all bracketry is in place and tightened down.
Содержание Diagraph IJ3000
Страница 2: ......
Страница 8: ...Integrated Valve Page iv of iv 5760 107 Operations Manual Rev C ...
Страница 10: ...Integrated Valve Section 1 Introduction Page 2 of 86 5760 107 Operations Manual Rev C ...
Страница 12: ...Integrated Valve Section 2 Safety Page 4 of 86 5760 107 Operations Manual Rev C ...
Страница 22: ...Integrated Valve Section 3 System Components Page 14 of 86 5760 107 Operations Manual Rev C ...
Страница 42: ...Integrated Valve Section 5 Frequently Asked Questions Page 34 of 86 5760 107 Operations Manual Rev C ...
Страница 60: ...Integrated Valve Section 7 Troubleshooting Page 52 of 86 5760 107 Operations Manual Rev C ...
Страница 62: ...Integrated Valve Appendix A System Specifications Page 54 of 86 5760 107 Operations Manual Rev C ...
Страница 72: ...Integrated Valve Appendix B Theory of Operation Page 64 of 86 5760 107 Operations Manual Rev C ...
Страница 76: ...Integrated Valve Appendix C Parts and Supplies Page 68 of 86 5760 107 Operations Manual Rev C ...
Страница 90: ...Integrated Valve Appendix G Testing an Electrical Outlet Page 82 of 86 5760 107 Operations Manual Rev C ...
Страница 92: ...Integrated Valve Appendix H Electrostatic Discharge ESD Page 84 of 86 5760 107 Operations Manual Rev C ...