1
2
3
4
Item Description
1.
Jackscrew
2.
Baseplate
3.
Foundation
4.
Plate
Figure 5: Jackscrews
3.
Level the driver mounting pads:
NOTICE:
Remove all dirt from the mounting pads in order to ensure that the correct leveling is achieved.
Failure to do so can result in equipment damage or decreased performance.
a) Put one machinist's level lengthwise on one of the two pads.
b) Put the other machinist's level across the ends of the two pads.
c)
Level the pads by adjusting the four jackscrews in the corners.
Make sure that the machinist's level readings are as close to zero as possible, both lengthwise and
across.
4.
Turn the center jackscrews down so that they rest on their plates on the foundation surface.
5.
Level the pump mounting pads:
NOTICE:
Remove all dirt from the mounting pads in order to ensure that the correct leveling is achieved.
Failure to do so can result in equipment damage or decreased performance.
a) Put one machinist's level lengthwise on one of the two pads.
b) Put the other level across the center of the two pads.
c)
Level the pads by adjusting the four jackscrews in the corners.
Make sure that the machinist's level readings are as close to zero as possible, both lengthwise and
across.
6.
Hand-tighten the nuts for the foundation bolts.
7.
Check that the driver's mounting pads are level and adjust the jackscrews and the foundation bolts
if necessary.
4.1 Pre-installation
16
Model Trash Hog II Installation, Operation, and Maintenance Manual
Содержание Goulds Pumps Trash Hog II
Страница 1: ...Installation Operation and Maintenance Manual Model Trash Hog II ...
Страница 2: ......