![ITRON Centron Скачать руководство пользователя страница 72](http://html1.mh-extra.com/html/itron/centron/centron_technical-reference-manual_2096034072.webp)
Operation: C12.19 C1SD, C1ST, and C1SL Versions
62
CENTRON® Meter Technical Reference Guide
Firmware Upgrades
PC-PRO+ Advanced 7.2 and higher supports upgrading firmware for CENTRON meters.
When the firmware is upgraded, all billing data in the meter is erased. After a meter’s
firmware is upgraded, you must re-initialize the meter.
You can determine which version of CENTRON meter firmware is installed on your PC by
looking at Add/Remove Programs in the Control Panel (Start | Settings | Control Panel) and
reading the Support Information for the CENTRON meter firmware. The firmware version
is also displayed each time you begin a firmware upgrade while logged on to a CENTRON
meter.
This feature is not available for meters that have been initialized (sealed) for
Canadian installations. If a Canadian meter has not been sealed, the firmware can be
upgraded.
Installing CENTRON Meter Firmware on the PC
You must install the CENTRON meter firmware on your computer to make it available to
PC-PRO+ Advanced . You can obtain firmware upgrades through your Itron, Inc. Sales
Representative. You can install only one version of CENTRON meter firmware on a
computer.
For more information, refer to your PC-PRO+ Advanced online help files and the
PC-PRO+ Advanced CENTRON Device User’s Manual.
Power Procedures
Applying Power
Personality Modules are powered directly from line voltage via the board-to-board
connector. These modules are energized when AC power is present. During power outages,
the permanently installed lithium battery runs the clock circuit on C1ST and C1SL versions.
The battery normally lasts for the life of the meter. However, in the unlikely event of a low
battery notification, the battery or Register Module may need to be replaced.
Power Down Procedures
To de-energize all electronics, remove power from the meter.
A power outage is recognized any time the line voltage drops 20 percent below the lowest
nominal point of the voltage range. When a power outage is recognized, the D/T/L Register
saves all billing values to non-volatile Flash memory.
Содержание Centron
Страница 1: ...CENTRON Meter Technical Reference Guide Effective Date October 2006...
Страница 10: ...Table of Figures x CENTRON Meter Technical Reference Guide Notes...
Страница 20: ...General Information 10 CENTRON Meter Technical Reference Guide Notes...
Страница 50: ...Operation C1SC Version 40 CENTRON Meter Technical Reference Guide Notes...
Страница 96: ...Glossary of Terms 86 CENTRON Meter Technical Reference Guide Notes...
Страница 100: ...Index 90 CENTRON Meter Technical Reference Guide Notes...