![ITRON Centron Скачать руководство пользователя страница 26](http://html1.mh-extra.com/html/itron/centron/centron_technical-reference-manual_2096034026.webp)
Installation
16
CENTRON® Meter Technical Reference Guide
Figure 11: Board-to-Board Connector, Bottom
8
Ensure the board-to-board connector is fully seated by pressing firmly in on the middle
of the connector.
Figure 12: Board-to-Board Connector, Top
9
Carefully replace the inner protective cover. Engage the top snaps first, taking care to
place the slot at the top of the cover over the IR light pipe. Failure to do so could break
the light pipe. Ensure that all four meter base tabs are engaged with the slots at the top
and bottom of the inner cover.
10
Place the cover over the meter base until the flange on the cover is flush with the flange
on the meter base.
11
Turn the cover clockwise until the locking tabs are fully engaged with the meter base.
12
If the cover has a Demand Reset or an Optical Connector, be sure these are properly
aligned with their corresponding accessory on the register faceplate. If not aligned
correctly, the Demand Reset or Optical Connector will not function properly. If the
Demand Reset plunger is not in the retracted position before turning the outer cover, the
mechanism may be damaged.
Содержание Centron
Страница 1: ...CENTRON Meter Technical Reference Guide Effective Date October 2006...
Страница 10: ...Table of Figures x CENTRON Meter Technical Reference Guide Notes...
Страница 20: ...General Information 10 CENTRON Meter Technical Reference Guide Notes...
Страница 50: ...Operation C1SC Version 40 CENTRON Meter Technical Reference Guide Notes...
Страница 96: ...Glossary of Terms 86 CENTRON Meter Technical Reference Guide Notes...
Страница 100: ...Index 90 CENTRON Meter Technical Reference Guide Notes...