PM605KT/PM605KT-B Technical documentation
4
2. Procedures from installation to operation
Some errors have been found.
Prepare the 24V DC power supply, such as DC power supply units.
Prepare a PC / Install the application
Open the package, and check the model, specifications, voltage, etc.
Check accessories.
Advance preparation
Start using only after you have understood all the product’ s functions, safety
information, and precautions.
Read this manual
Product check
Perform maintenance and inspection
based on corresponding parts.
Maintenance
Switch settings.
Control
Commissioning before operation.
Commissioning
Run operation.
Install the MDR.
Installation
Mount driver cards.
Connect power and signal cables to driver cards.
Wiring
No
Yes
Procedures from
installation to operation
P.12 〜
P.17 〜
P.20〜
Procedures from installation to operation
See Technical doc
for dedicated
driver.
See Technical doc
for dedicated
driver.
Original notice - A1.1