SuperBus® 2000 2 x 20 VFD Alphanumeric Touchpad

Mounting the Touchpad

3.

Insert the touchpad wiring harness connector onto the 
pins located on the rear of the unit. Make sure the yel-
low wires are to the left (see Figure 5).

Figure 5. Wiring the Touchpad to Advent Panels

Mounting the Touchpad

1.

Align the slots on the touchpad with the slots on the 
back-plate. Insert the mounting tabs into the mounting 
slots and press the keypad toward the wall/gang box.

2.

Tighten the two bottom screws.

Setting Touchpad Unit Numbers

Note

In multiple partition systems all new touchpads default 
to partition 1. To change partition assignment please 
see specific panel 

Installation Instructions. All 

partitions must be disarmed before entering program 
mode.

Panels automatically assign or learn the unit numbers of 
each bus device upon power up or entering programming 
mode. SuperBus 2000 panels (Advent panels and Concord 
panels with software version 2.0 or newer) automatically 
assign different unit numbers to each SuperBus 2000 mod-
ule. SuperBus panels (UltraGard panels and Concord panels 
with software versions 1.0–1.6) do not automatically assign 
different unit numbers to each SuperBus 2000 module. For 

these panels, alphanumeric touchpads default to 001. If 
desired or necessary, the unit number must be manually 
changed.

Guidelines for Assigning Alphanumeric Touchpad 
Unit Numbers (Concord panels with software 
versions 1.0–1.6 and UltraGard panels)

Use the following guidelines to avoid communication con-
flicts between bus devices and the panel:

Always start with one touchpad connected to the panel 
and make sure it is working properly before connecting 
additional touchpads.

Whenever possible, such as in new installations, assign 
alphanumeric touchpad unit numbers before beginning 
all other panel programming.

Other bus devices with device unit number DIP 
switches (ESM, HIM, etc.) must be set to the desired 
unit number before applying power and entering 
program mode.

Power Up and Bus Communication

Powering Up UltraGard Panels

First Touchpad

1.

Disconnect all bus device wiring from the panel except 
for the touchpad location closest to the panel. 

2.

Verify that all wiring at the panel and touchpad wiring 
harness is correct.

3.

With the panel power switch off, connect the panel bat-
tery and plug in the panel AC power transformer.

4.

Set the panel RUN/PROGRAM switch to RUN.

5.

Turn on the panel power switch.

6.

Put the touchpad into the manual configuration mode 
by pressing and holding the touchpad 

D

 and 

6

 buttons 

until the display shows 

DA 001 

(unit number 001).

7.

Set the panel RUN/PROGRAM switch to PROGRAM 
and the display should read 

PROGRAM MODE

.

8.

Verify correct operation by pressing STATUS or 
BYPASS. The display should show a different menu 
item for each button pressed.

If your installation only calls for one alphanumeric touch-
pad, you may proceed with other system programming. If 
you have more alphanumeric touchpads to connect and 
assign device addresses, use the following procedure before 
proceeding with any other system programming.

8543109C.DSF

NOT 
USED

YELLOW

TOUCHPAD

WIRING HARNESS

49-430

SPLICE

PANEL SUPERBUS

WIRING 

HARNESS 49-462

BL

ACK (

G

ND)

WHI

T

E

 (

B

US

 B)

GREEN (

B

US A)

RED (

+

1

2

 VDC)

TO ADDITIONAL

SUPERBUS

TOUCHPADS

AND/OR

MODULES

TAB

SLOT (3)

OPTIONAL

N/C SWITCH

WITH MAGNET

2K OHM

EOL RESISTOR

OPTIONAL

N/O SWITCH

WITH MAGNET

Connect Shield 
to Earth Ground

SHIELDED

CABLE

Содержание 60-804-04 - Concord LCD/VFD Alphanumeric SuperBus Keypad

Страница 1: ...cally default to unit number 001 SuperBus Panels UltraGard Concord software versions 1 0 1 6 Installation Guidelines For the maximum number of bus devices and touchpads per panel see Table 1 Do not ex...

Страница 2: ...hors 4 Secure the back plate to the wall with included screws 5 Cut a hole in the wall where the wire access hole was marked to pull your cable through Figure 1 Touchpad Mounting Slots To mount the to...

Страница 3: ...tch must be unsupervised and a resistor must not be used Note The optional touchpad hardwire input must be added to panel memory See the Concord Concord Express panel Installation Instructions for set...

Страница 4: ...and make sure it is working properly before connecting additional touchpads Whenever possible such as in new installations assign alphanumeric touchpad unit numbers before beginning all other panel p...

Страница 5: ...at steps 11 through 16 for any other new alphanumeric touchpads Be sure to disconnect each touchpad after assigning its unit number 17 After assigning unit numbers to all the new touchpads connect eac...

Страница 6: ...ystem status Note If after pressing the touchpad does not display the current system status see Troubleshooting Powering Up Advent Panels New Installations 1 Verify that all wiring between the panel a...

Страница 7: ...nd no beeps when buttons are pressed 1 Check for correct wiring connec tions at the touchpad and panel terminals 2 Make sure the panel battery is connected correctly and that the panel transformer is...

Страница 8: ...ce with the instruction manual may cause harmful interference to radio communications Operation of this equipment in a residential area is likely to cause harmful interfer ence in which case users wil...

Отзывы: