ON
COMPACT V IN
FIX ALL THE COMPONENTS (chapter 5 pag 20), leaving out of the pipe the
conductivity and PH / RX detector.
•
PREPARE THE SOLUTION TO INJECT WITH THE RIGHT
CONCENTRATION
•
GAUGE THE CONDUCTIVITY ELCTRODE (chapter 7) and place it in the
pipe. To gauge with another buffer see Special Configuration Menu
(chapter 4.1 pag 7).
•
GAUGE PH / RX ELECTRODE (chapter 4.2 pag 10) and place it in the
pipe.
•
GAUGE FLOWMETER AND INTRODUCE INJECTION FLOW. To change
the units see the Special Configuration Menu (chapter 4.1 pag 7).
•
INTRODUCE PROPORTIONALITY ORDER AND SELECT e:
EXTERNAL
OUTPUT SIGNAL TO BE REGULATED
.
•
SELECCION DE LA VISUALIZACION DE LA SEÑAL DE SALIDA EN
mA
:
SEÑAL PARA EL VARIADOR
(capítulo 4.7 pag 19).
OFF
COMPACT V IN
WAIT FOR THE READINGS TO BECOME STABLE. (Si es necesario, modificar
la consigna de proporcionalidad para ajustar el valor de la conductividad o el
PH / RX según se inyecte abono o ácido).
•
IINTRODUCE THE NECESSARY ALARMS (chapter 4.4).
25
ON
COMPACT V IN
FIX ALL THE COMPONENTS (chapter 5 pag 20), leaving out of the pipe the
conductivity and PH / RX detector.
•
PREPARE THE SOLUTION TO INJECT WITH THE RIGHT
CONCENTRATION
•
GAUGE THE CONDUCTIVITY ELCTRODE (chapter 7) and place it in the
pipe. To gauge with another buffer see Special Configuration Menu
(chapter 4.1 pag 7).
•
GAUGE PH / RX ELECTRODE (chapter 4.2 pag 10) and place it in the
pipe.
•
GAUGE FLOWMETER AND INTRODUCE INJECTION FLOW. To change
the units see the Special Configuration Menu (chapter 4.1 pag 7).
•
INTRODUCE PROPORTIONALITY ORDER AND SELECT e:
EXTERNAL
OUTPUT SIGNAL TO BE REGULATED
.
•
SELECCION DE LA VISUALIZACION DE LA SEÑAL DE SALIDA EN
mA
:
SEÑAL PARA EL VARIADOR
(capítulo 4.7 pag 19).
OFF
COMPACT V IN
WAIT FOR THE READINGS TO BECOME STABLE. (Si es necesario, modificar
la consigna de proporcionalidad para ajustar el valor de la conductividad o el
PH / RX según se inyecte abono o ácido).
•
IINTRODUCE THE NECESSARY ALARMS (chapter 4.4).
25