27
OFF
COMPACT V IN
•
FIX ALL THE COMPONENTS (chapter 5 pag 20), leaving out of the pipe the
conductivity and PH / RX detector.
•
PREPARE THE SOLUTION TO INJECT WITH THE RIGHT
CONCENTRATIONS
•
GAUGE THE CONDUCTIVITY DETECTOR (chapter 4.2 pag 9) and place it in
the pipe. To gauge with another buffer see Special Configuration Menu
(capítulo 4.1 pag 7).
•
GAUGE PH ELECTRODE (chapter 4.2 pag 10) and place it in the pipe.
•
GAUGE FLOWMETER (chapter 4.2 pag 11). To change the units see the
Special Configuration Menu (chapter 4.1 pag 11).
•
INTRODUCE PROPORTIONALITY ORDER AND SELECT e: EXTERNAL
OUTPUT SIGNAL TO BE REGULATED.
•
SELECT FOR THE VISUALIZATION OF THE OUTPUT SIGNAL
mA
: signal for
the inverter.
•
SELECT AUTOMATIC REGULATION (chapter 4.5 pag 18).
•
START THE INSTALLATION (ONLY WATER) AND CHECK THE READINGS.
27
OFF
COMPACT V IN
•
FIX ALL THE COMPONENTS (chapter 5 pag 20), leaving out of the pipe the
conductivity and PH / RX detector.
•
PREPARE THE SOLUTION TO INJECT WITH THE RIGHT
CONCENTRATIONS
•
GAUGE THE CONDUCTIVITY DETECTOR (chapter 4.2 pag 9) and place it in
the pipe. To gauge with another buffer see Special Configuration Menu
(capítulo 4.1 pag 7).
•
GAUGE PH ELECTRODE (chapter 4.2 pag 10) and place it in the pipe.
•
GAUGE FLOWMETER (chapter 4.2 pag 11). To change the units see the
Special Configuration Menu (chapter 4.1 pag 11).
•
INTRODUCE PROPORTIONALITY ORDER AND SELECT e: EXTERNAL
OUTPUT SIGNAL TO BE REGULATED.
•
SELECT FOR THE VISUALIZATION OF THE OUTPUT SIGNAL
mA
: signal for
the inverter.
•
SELECT AUTOMATIC REGULATION (chapter 4.5 pag 18).
•
START THE INSTALLATION (ONLY WATER) AND CHECK THE READINGS.