WatchPAT™300 System
23
Operation Manual
Figure 8
– WatchPAT™ Fully Prepared
3.6
Preparing the
WatchPAT™
Device for a New Study
Refer to the zzzPAT Software Manual for preparation of the WP300 for a new study.
3.7
Testing the
WatchPAT™ Device
Run the built-in self-diagnostic facility as described in Section 2.4 above.
The WatchPAT™ device is now ready for performance of a sleep study by the patient
(Figure 8).
3.8
WP300 Self-diagnostic Test Results and Trouble-shooting
Should any of the self-diagnostic tests fail or report error messages refer to the trouble-
shooting guide in Section 9.
3.9
Packing the Carrying Case
uPAT probe
Snore and Body
Position sensor
Bracelet
connectors