7
fuse.
●
In operation of the wind turbine, opening the fuse or replacing the fuse is
forbidden so as not to injury the personnel or damage the machine. Make the
wind turbine in three-phase dump load state, when replacing the fuse; disconnect
the connection switch of the battery group to check or replace the fuse pipe.
●
When the battery is completely charged to 125% of the rated voltage, the
controller will automatically brake the wind turbine and stop charging the battery,
meanwhile, the over charge indicator is on. When voltage of the battery drops to
108% of the rated voltage, the over charge indicator is off and the wind turbine
recovers to charge the battery.
3
)
Manual three-phase dump load switch
1. When the battery is connected correctly, place the switch of the wind turbine on
the back plate on RUM, the wind turbine is in operation state.
2. When the machine is not in use or the wind is too strong or in dismantlement
of the battery, loof the wind turbine, then place the switch of the wind turbine on
STOP and make the wind turbine in three-phase dump load state.
Ϭ
Operation Steps
1
)
The automatic controller shall be strictly operated in accordance with the
following operation steps when it is installed or maintained periodically.
1. Place the manual blower switch on STOP before operation and make the
wind turbine group in three-phase dump load state.
2. After disconnecting the switch to connect the battery (or fuse), connect the
battery group; misconnecting of positive electrode and negative electrode of the
battery is forbidden.
3. Connect the unloader with the controller (see the wiring diagram);
4. Connect the three-phase wire of the wind turbine with the wind turbine
terminals on the controller;
5. Make the battery switch (or fuse) in connection state;