ista Breeze FKJ-B(PWM)-1KW48Vdc Скачать руководство пользователя страница 13

 

 

13 

Image

 

E

xplanation

 

 

Wind turbine 

 

The  wind  turbine  images  display,  showed  that  wind 
generators running normally.

 

 

Solar panel

 

The  solar  panels images  display,  showed  that  solar  panels 
working normally.

 

 

 

Battery

 

Battery internal strip graphics, showed battery power.   

When  the  battery  charged  enough, the  battery  voltage 

reached  125%  of  the  rated  voltage. The  wind  turbine  will 

automatically carry out three-phase dump load discharging to 

stop charging. The 3 strip graphics in battery box all display. 

When the battery voltage drops to 108% of the rated voltage, 

the wind turbine recovers to charge the battery. 

When the battery voltage is too low, the frame of the battery 

image will  flashing,  remind  users  battery  is  low  voltage,  at 

this  time,  please  stop  using  battery,  to  charge  battery,  until 

stop flashing, just can be used.

 

 

PWM dump load

 

In  the  conditions  of  strong  or  super-strong  wind,  battery 

charged by the wind turbine generator under constant voltage 

and  current.  Then  this  image  display.  When  voltage  of  the 

battery  drops  to  108%  of  the  rated  voltage,  the  image  not 

displayed.

 

 

 

 

Three-phase dump load 

When the battery is full (the battery pressure reaching 125% 

of the rated pressure), the controller will automatically carry 

out  three-phase  dump  load  discharging  to  stop  charging 

battery. Then this image display. 

When  the  battery  voltage  reduces  to  108%  of  the  rated 

Содержание FKJ-B(PWM)-1KW48Vdc

Страница 1: ...Model FKJ B PWM 1KW48V With 600W Solar PWM WIND SOLAR HYBRID CHARGE CONTROLLER USER MANUAL Read the user manual carefully before use...

Страница 2: ...roller 6 Usage 6 Operation Steps 7 Remove wiring step controller 8 Failure Analysis 11 Box diagram 11 Liquid crystal screen operation and display 12 Attentions 14 Maintenance of Battery 15 Functional...

Страница 3: ...that electrician make a install Using direction make sure read this instruction book carefully before appliance The equipment must be installed by professionals To avoid personal injury make sure it...

Страница 4: ...duct for many times by the state in the assistance project of exported wind energy PWM model Product Characteristics The product is manufactured according the JB T6939 1 2004 industrial standard and G...

Страница 5: ...5 of the rated voltage the controller will carry out three phase dump load automatically to stop charging the battery Auto recharging of battery When the battery voltage reduces to 108 of the rated vo...

Страница 6: ...connect the solar panels with the solar of the controller Connect the PWM dump load terminal on the unloader with the PWM dump load terminal on the controller connect them in accordance with the wiri...

Страница 7: ...on the back plate on RUM the wind turbine is in operation state 2 When the machine is not in use or the wind is too strong or in dismantlement of the battery loof the wind turbine then place the switc...

Страница 8: ...tilated Operating environment which is under direct sunlight exposed to sunshine humid and full of acid mist is forbidden Operating environment which has dust and dirt is forbidden Put the machine in...

Страница 9: ...9 Remove wiring step controller...

Страница 10: ...10...

Страница 11: ...rbine shall be turn off immediately to check whether the fuse is blown the battery is connected well or the battery is damaged 2 After the battery is connected but the wind turbine can not work and th...

Страница 12: ...y 1 Operation explanation Press the front panel of the button LCD screen light Each press parameters change again Stop the operation 1 minute LCD screen automatically put out to save electricity 2 Dis...

Страница 13: ...s to charge the battery When the battery voltage is too low the frame of the battery image will flashing remind users battery is low voltage at this time please stop using battery to charge battery un...

Страница 14: ...e Wind turbine charge current Wind turbine power Solar panel voltage Solar panel charge current Solar panel power Battery voltage Attentions We have taken full consideration of possibilities of occurr...

Страница 15: ...rge the battery separately 2 The maintenance free battery shall be maintained periodically in accordance with user manual of the maintenance free battery 3 Misconnection of the electrode of the batter...

Страница 16: ...rtition board reveal on it 8 The electrolyte shall be adjusted to normal density 1 26 1 28 g cm3 this parameter may be based upon the user manual and this can only be done after battery charging is en...

Страница 17: ...17 Functional Diagram Wiring diagram PWM off grid Controller Unloader...

Страница 18: ...panel voltage solar panel current solar panel power battery voltage charge current PWM constant pressure voltage 58Vdc 3 phase brake voltage of the wind turbine 60 1Vdc Recovery charging voltage of t...

Страница 19: ...320 Weight of the controller 18 Kg Size of the dump load mm 480 360 200 Weight of the dump load 6 5 Kg Warning Dismantlement of the unloader in the use is forbidden The unloader must be connected in...

Отзывы: