ista Breeze FKJ-B(PWM)-1KW48Vdc Скачать руководство пользователя страница 15

 

 

15 

damage of the controller. 

●It  is  suggested  that  the  capacity  of  the  battery  be  checked  periodically  (with 

specific measuring tools instead of universal meter). Each and every battery shall 

go through checks of the capacity, contact condition and timely erasing of rust on 

the  terminals  of  positive  and  negative  electrodes.  (The  checks  shall  be  done 

when the wind turbine is in brake state.) 

The battery voltage drop to less than 85% rated voltage, 

the frame of 

the battery image will flashing, remind users battery is low voltage, at this time, 

should stop used immediately,

 

timely to charge battery. Otherwise, battery will 

damaged. 

●This machine can not charge the exhausted or damaged battery. When voltage 

of the battery is 75% lower than the rated voltage, replace the battery in time or 

charge the battery separately. 

2. The maintenance-free battery shall be maintained periodically in accordance with 

user manual of the maintenance-free battery. 

3. Misconnection of the electrode of the battery is forbidden. 

4. Owing to the unloader equipped on this machine can produce high temperature 

in working , please put it in the place with better ventilation and heat dispersion 

and 2 meters away from the host and where the man or livestock can not reach. 

Covering  with  other  objects  or  using  it  under  the  flammable  or  explosive  gas 

environment is forbidden to prevent fire. 

5. The  machine should be  managed by  professionals  for  your safety. It  should be 

grounded  reliably  to  resist  electric  shock. The  ground  resistance  should  be  less 

than 1Ω and the connecting wire should be larger than 10

²mm. 

ϱϩ

Maintenance of Battery 

Maintenance  of  battery  is  a  key  link  in  work.  Different  maintenance  methods  are 

used to different kinds of batteries or battery series. For the lead-acid battery (except 

Содержание FKJ-B(PWM)-1KW48Vdc

Страница 1: ...Model FKJ B PWM 1KW48V With 600W Solar PWM WIND SOLAR HYBRID CHARGE CONTROLLER USER MANUAL Read the user manual carefully before use...

Страница 2: ...roller 6 Usage 6 Operation Steps 7 Remove wiring step controller 8 Failure Analysis 11 Box diagram 11 Liquid crystal screen operation and display 12 Attentions 14 Maintenance of Battery 15 Functional...

Страница 3: ...that electrician make a install Using direction make sure read this instruction book carefully before appliance The equipment must be installed by professionals To avoid personal injury make sure it...

Страница 4: ...duct for many times by the state in the assistance project of exported wind energy PWM model Product Characteristics The product is manufactured according the JB T6939 1 2004 industrial standard and G...

Страница 5: ...5 of the rated voltage the controller will carry out three phase dump load automatically to stop charging the battery Auto recharging of battery When the battery voltage reduces to 108 of the rated vo...

Страница 6: ...connect the solar panels with the solar of the controller Connect the PWM dump load terminal on the unloader with the PWM dump load terminal on the controller connect them in accordance with the wiri...

Страница 7: ...on the back plate on RUM the wind turbine is in operation state 2 When the machine is not in use or the wind is too strong or in dismantlement of the battery loof the wind turbine then place the switc...

Страница 8: ...tilated Operating environment which is under direct sunlight exposed to sunshine humid and full of acid mist is forbidden Operating environment which has dust and dirt is forbidden Put the machine in...

Страница 9: ...9 Remove wiring step controller...

Страница 10: ...10...

Страница 11: ...rbine shall be turn off immediately to check whether the fuse is blown the battery is connected well or the battery is damaged 2 After the battery is connected but the wind turbine can not work and th...

Страница 12: ...y 1 Operation explanation Press the front panel of the button LCD screen light Each press parameters change again Stop the operation 1 minute LCD screen automatically put out to save electricity 2 Dis...

Страница 13: ...s to charge the battery When the battery voltage is too low the frame of the battery image will flashing remind users battery is low voltage at this time please stop using battery to charge battery un...

Страница 14: ...e Wind turbine charge current Wind turbine power Solar panel voltage Solar panel charge current Solar panel power Battery voltage Attentions We have taken full consideration of possibilities of occurr...

Страница 15: ...rge the battery separately 2 The maintenance free battery shall be maintained periodically in accordance with user manual of the maintenance free battery 3 Misconnection of the electrode of the batter...

Страница 16: ...rtition board reveal on it 8 The electrolyte shall be adjusted to normal density 1 26 1 28 g cm3 this parameter may be based upon the user manual and this can only be done after battery charging is en...

Страница 17: ...17 Functional Diagram Wiring diagram PWM off grid Controller Unloader...

Страница 18: ...panel voltage solar panel current solar panel power battery voltage charge current PWM constant pressure voltage 58Vdc 3 phase brake voltage of the wind turbine 60 1Vdc Recovery charging voltage of t...

Страница 19: ...320 Weight of the controller 18 Kg Size of the dump load mm 480 360 200 Weight of the dump load 6 5 Kg Warning Dismantlement of the unloader in the use is forbidden The unloader must be connected in...

Отзывы: