ista Breeze FKJ-B(PWM)-1KW48Vdc Скачать руководство пользователя страница 6

 

 

Ϫ

 

Pictures of controller

 

 

ϫ

 Usage 

1

External wire   

The  positive  electrode  (

)  and  negative  electrode  (

)  of  the  battery  shall  be 

connected with the terminals of the machine respectively without misconnection 

or short circuit.   

The  three-phase  output  wires  of  the  wind  turbine  shall  be  connected  with  the 

terminals  on  the  backside  of  the  controller  respectively  (the  three-phase  wires 

have no chronological order.) 

connect the solar panels with the solar +, - of the controller. 

Connect  the  PWM  dump  load  terminal  on  the  unloader  with  the  PWM  dump 

load terminal on the controller;    (connect them in accordance with the wiring 

diagram strictly). 

2

 

When voltage of the battery is lower than the discharge lower limit (for details, 

see the attached table on the back), power shortage indicator is on to warn users 

that  the  battery  is  at  the  discharge  lower  limit.  At  this  moment,  stop  using  the 

battery and charge the battery before it can be used again.   

When  the  fuse  is  blown,  the  fuse  indicator  is  on  to  warn  users  to  change  the 

Содержание FKJ-B(PWM)-1KW48Vdc

Страница 1: ...Model FKJ B PWM 1KW48V With 600W Solar PWM WIND SOLAR HYBRID CHARGE CONTROLLER USER MANUAL Read the user manual carefully before use...

Страница 2: ...roller 6 Usage 6 Operation Steps 7 Remove wiring step controller 8 Failure Analysis 11 Box diagram 11 Liquid crystal screen operation and display 12 Attentions 14 Maintenance of Battery 15 Functional...

Страница 3: ...that electrician make a install Using direction make sure read this instruction book carefully before appliance The equipment must be installed by professionals To avoid personal injury make sure it...

Страница 4: ...duct for many times by the state in the assistance project of exported wind energy PWM model Product Characteristics The product is manufactured according the JB T6939 1 2004 industrial standard and G...

Страница 5: ...5 of the rated voltage the controller will carry out three phase dump load automatically to stop charging the battery Auto recharging of battery When the battery voltage reduces to 108 of the rated vo...

Страница 6: ...connect the solar panels with the solar of the controller Connect the PWM dump load terminal on the unloader with the PWM dump load terminal on the controller connect them in accordance with the wiri...

Страница 7: ...on the back plate on RUM the wind turbine is in operation state 2 When the machine is not in use or the wind is too strong or in dismantlement of the battery loof the wind turbine then place the switc...

Страница 8: ...tilated Operating environment which is under direct sunlight exposed to sunshine humid and full of acid mist is forbidden Operating environment which has dust and dirt is forbidden Put the machine in...

Страница 9: ...9 Remove wiring step controller...

Страница 10: ...10...

Страница 11: ...rbine shall be turn off immediately to check whether the fuse is blown the battery is connected well or the battery is damaged 2 After the battery is connected but the wind turbine can not work and th...

Страница 12: ...y 1 Operation explanation Press the front panel of the button LCD screen light Each press parameters change again Stop the operation 1 minute LCD screen automatically put out to save electricity 2 Dis...

Страница 13: ...s to charge the battery When the battery voltage is too low the frame of the battery image will flashing remind users battery is low voltage at this time please stop using battery to charge battery un...

Страница 14: ...e Wind turbine charge current Wind turbine power Solar panel voltage Solar panel charge current Solar panel power Battery voltage Attentions We have taken full consideration of possibilities of occurr...

Страница 15: ...rge the battery separately 2 The maintenance free battery shall be maintained periodically in accordance with user manual of the maintenance free battery 3 Misconnection of the electrode of the batter...

Страница 16: ...rtition board reveal on it 8 The electrolyte shall be adjusted to normal density 1 26 1 28 g cm3 this parameter may be based upon the user manual and this can only be done after battery charging is en...

Страница 17: ...17 Functional Diagram Wiring diagram PWM off grid Controller Unloader...

Страница 18: ...panel voltage solar panel current solar panel power battery voltage charge current PWM constant pressure voltage 58Vdc 3 phase brake voltage of the wind turbine 60 1Vdc Recovery charging voltage of t...

Страница 19: ...320 Weight of the controller 18 Kg Size of the dump load mm 480 360 200 Weight of the dump load 6 5 Kg Warning Dismantlement of the unloader in the use is forbidden The unloader must be connected in...

Отзывы: