6
Ϫ
Pictures of controller
ϫ
Usage
1
)
External wire
●
The positive electrode (
) and negative electrode (
) of the battery shall be
connected with the terminals of the machine respectively without misconnection
or short circuit.
●
The three-phase output wires of the wind turbine shall be connected with the
terminals on the backside of the controller respectively (the three-phase wires
have no chronological order.)
●
connect the solar panels with the solar +, - of the controller.
●
Connect the PWM dump load terminal on the unloader with the PWM dump
load terminal on the controller; (connect them in accordance with the wiring
diagram strictly).
2
)
●
When voltage of the battery is lower than the discharge lower limit (for details,
see the attached table on the back), power shortage indicator is on to warn users
that the battery is at the discharge lower limit. At this moment, stop using the
battery and charge the battery before it can be used again.
●
When the fuse is blown, the fuse indicator is on to warn users to change the
Содержание FKJ-B(PWM)-1KW48Vdc
Страница 9: ...9 Remove wiring step controller...
Страница 10: ...10...
Страница 17: ...17 Functional Diagram Wiring diagram PWM off grid Controller Unloader...