background image

Page 

7

 

 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

Figure 3 

Figure 5 - Junction Box 

Installing the Electrical Conduit 

 
Only one Knock-Out is provided from the factory on the top left corner of the RLA Controller. 

 

Connect rigid conduit for the required 120 VAC electrical service at the top left as indicated in  

 

Figure 4. 

 

Conduit holes for wiring to Terminals 1 & 2 may be made on the top, bottom, or right side of the enclosure.  

 

Important! 

 

All local codes must be followed when connecting the conduit to the service panel. 

 

Figure 4 – Controller 
 

   Knock-out 

holes 

Wiring the RLA Controller 

 

Important! 
Verify that the electrical supply is disconnected prior to 
connecting wiring to the RLA Controller.  

 
To wire the RLA Controller: 
1.

 

Remove the junction box cover from the panel 
surface. 

2.

 

Make final connections to the 120 VAC electrical 
service to wiring within the junction box. Verify that 
line wiring (Black), neutral (White), and ground wire 
(Green) are correctly connected. Minimum 
recommended wire size is 14 AWG. 

3.

 

Replace the junction box cover before activating or 
testing the unit.  

Содержание RLA Series

Страница 1: ...3 Residential Water Leak Detection RLA 3 Installation Maintenance Operations and Start up Instructions Read all instructions BEFORE installation and USE of Controller KEEP INSTRUCTIONS FOR FUTURE USE...

Страница 2: ...d monitoring systems The system should be thoroughly tested and adjustments made at time of initial operation Periodic testing should be conducted by the user to assure that all components function an...

Страница 3: ...nnecting Controlled Services 10 Battery Backup 10 Connecting Alarm Monitoring Wiring 11 Start Up Checklist 11 Start Up Test Preliminary Information 11 Start Up Test 12 Equipment Operation 13 Troublesh...

Страница 4: ...be confirmed prior to installation Enclosed with this Manual is a separate registration form The front of the form is for equipment warranty registration The back is a copy of the equipment start up c...

Страница 5: ...Page 5...

Страница 6: ...n time to ensure that this occurs A Flush Mounting Trim Flange is provided with each flush mounted unit Separate installation instructions and hardware are included with this flange Semi and Flush Tri...

Страница 7: ...e followed when connecting the conduit to the service panel Figure 4 Controller Knock out holes Wiring the RLA Controller Important Verify that the electrical supply is disconnected prior to connectin...

Страница 8: ...extend lock position STEP 4 Installing Flush Door Trim Figure 7 Prior to installing Door Trim ensure that wall finishes are complete and that the door panel has been installed To install the Flush Doo...

Страница 9: ...escription of Status When Light is On PWR PLC has 24VDC from Power Supply RUN PLC is set to RUN Mode and is operational ERR PLC Processor has incurred an error X1 Door Panic Button is being pressed X2...

Страница 10: ...ctly to the Output Terminal in order to function as intended Connect Supply Solenoid to the ON w Latch Terminals Make connections to BLK and WHT pins to match instructions provided with the solenoids...

Страница 11: ...ct short or input voltage at the output circuit will cause damage to the PLC and Controller Verify that the Door Panel plug is firmly secured to its terminal and ground wire is connected Examine Door...

Страница 12: ...ing system a Press and release the red Panic Button b Verify that all Solenoids have been deactivated 2 Press the Reset System button on the screen NOTE Electrical Service will not shut down with Pani...

Страница 13: ...l breakage in piping or circuits may cause damage to the facility Integral time delay programming insures that brief seismic or similar activity will not affect services To Activate One or More of the...

Страница 14: ...l In many cases failure of the system is the result of improper connection of a remote service or device such as a remote relay solenoid or building alarm system Refer to Equipment Specifications to c...

Страница 15: ...all moisture is removed from the compartment The electronic controller PLC is sensitive to moisture dust debris and other air borne particles Do not expose the interior compartment of the enclosure Du...

Страница 16: ...not specifically intended for use in applications where a master shut down and re instate device is located away from areas of normal use ISIMET s opinion is that in such cases there is risk that the...

Отзывы: